Information

  • Foreman

  • Location (nearest town)

  • Location (specific)
  • Cooperative or Client

  • Work being performed

  • Conducted on

  • Inspector name

  • Audit Guidance: -All unsafe acts shall be stopped immediately. -Field Observations shall include photos for both safe and unsafe operations. Photos should be annotated with what the observer is focused on at the time of the audit. -Any item marked as a deficiency shall have a photo (if possible) and a detailed description. -All comments should identify those crew members performing the task correctly and/or incorrectly. -Equipment being inspected shall be listed and/or have a photo with the unit number displayed. -All audits shall be reviewed with the PIC prior to departure from the site. Corrective actions shall be assigned with due dates and noted on the audit. -Any audits being forwarded to the client shall be reviewed by more than one safety team member prior to being sent.

  • All audit findings shall have an assigned weight (1-4) assigned per the below matrix. Document the weighted number rating in the comment section associated with the applicable question.

    no label

Communication

  • When was the last time you were coached from a member of management on safety?

  • Do we discuss the Likelihood of an incident or the consequences of an incident?

  • Cell phone use by Supervision only?

  • Proper use of hand signals and flagging techniques? Spotters used appropriately?

Procedures and Documents

  • Tailboard/Job Hazard analysis completed?

  • Weekly/Daily inspection sheets complete and up to date?

  • Are SDS available for all hazardous chemicals on site ?

Displays and Labels

  • Is the work site properly marked and/or barricaded? (open troughs, trenches, stationary objects, around cranes, spoil piles marked 10' from leading edge).

  • One call complete and adequate?

Environmental

  • Holes being left open overnight properly barricaded and covered?

  • Spill kits available and stocked? Spill response understood and practiced? Spills reported?

Schedule

  • fatigue management addressed?

Work Practices

  • Proper pole control, experienced persons handling butt of poles?

  • Drop Zones properly barricaded when aerial work is being performed?

  • Truck grounds being barricaded?

  • Proper Cover up and PPE being used?

  • Are proper lifting/carrying techniques utilized?

  • Are proper pushing/pulling techniques utilized?

  • Are employees using 3 points of contact when ascending, descending, and climbing?

  • Is employee mindful of line of fire and pinch points?

  • Proper rigging, lifting, hand signals, and good communication being utilized?

  • Is 3-part communication properly used ?

  • Has circuit testing, tagging and proper use of grounds been performed properly?

  • Animals, plants and insects mitigated?

  • Have phasing sticks been used when jumpering multiple phases?

  • Is the housekeeping good?

Work Planning

  • Job Plan (does everyone know duties)?Have the job hazards been identified, prioritized, and documented?Work area clearly defined on JSA?Has an effective control/mitigation plan for identified hazards been developed?

  • Severe weather contingency plan discussed and documented?

  • Has the emergency plan been documented and understood? (evacuation plan in place)

  • Is fall protection equipment in good condition and rescue plan in place?

Supervision

  • Emphasis of schedule exceeding safe work?

  • Supervision interfacing with workers?

  • Supervision verifying the job hazard analysis/job plan is being followed?

  • Crew lead demonstrated leadership ability?

Training/Qualification

  • Crew Members qualified for task being performed?

Change Management

  • JSA updated periodically and whenever work task changes? Scope changes time stamped?

External Influence

  • Weather conditions discussed and documented?

  • Heat/cold mitigation plan in use and documented?

  • Public encrouchment on job site discussed and documented on JSA?

System/Equipment Operation

  • Has the company dispatch been notified of LOTO for circuits being worked?

  • Are fall protection and rubber PPE/Cover-up being stored properly?

  • Are seat belts being used on applicable equipment while in operation?

  • Are rubber goods and plastic cover up in date? Are they being inspected and replaced when rejected?

  • All PPE in good order and utilized? hard hat, eye protection, hearing protection, vest, footwear, gloves, face shield, chaps etc.

  • Cut resistant gloves utilized when stripping, cutting conduit or anytime sharp objects are present?

  • Arc flash protection being utilized (correct class)?

  • Are work boots ASTM F2413-11 compliant?

  • If applicable, 100% fall protection being utilized?

Personnel and Materials Management

  • Sufficient personnel assigned to task?

Equipment Selection and use

  • Is all equipment set up for safe use (outriggers set up properly as applicable)?

  • Are fire extinguishers on site, within date, and in good working order?

  • Skinning and Stripping tools utilized and in good condition?

  • Hot Sticks/Shotguns inspected and in good, working condition?

  • Hot Sticks/shotguns inspected and in good condition?

  • Are grounds cleaned and inspected before use?

  • Slings, rigging and kellum grips being inspected daily and rejected when needed?

  • Chocks and cones being used?

  • Hoists, hand lines, or anything with hooks have safety latches in place?

  • Are the proper tools for the job being utilized, and are tools in good condition with no modifications?

  • Eye wash station or solution in good working order and readily available?

Management

  • Short service employee's identified?

  • Timely response to known problems?

  • Policies, practices, procedures properly defined?

  • incidents/near misses reported in a timely manner?

Machine Maintenance/Testing

  • Unit photos

  • Has the crew performed and documented an inspection of the equipment prior to work to assure equipment is in safe operating condition?

  • Are safety/medical/first aid equipment/ goods on site and within date?

  • Di-electric testing on booms completed?

  • Back up alarms working properly

  • Is equipment damage/malfunctions recorded?

Design Configuration

  • Equipment properly barricaded when work is performed near live voltage or when grounded?

  • Are appropriate DOT signs and cones in place?

Summary and signatures

  • Positive observations. List crew members and specific items they are doing correctly:

  • Number of personnel and printed names

  • Number of trucks checked

  • Number of trucks on site

  • Inspectors signature

  • Crew lead signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.