Information
-
Inspection No.
-
Site
-
Conducted on
-
Prepared by
-
1. Are flight files stored locally for a minimum of 3 months?
-
2. Is the office environment conducive to performing load control function (e.g. quiet, not overcrowded)?
-
3. Is there more than one communication method between the office and the A/C?
-
4. Do all staff speak english (level sufficient to communicate the information)?
-
5. Are staff aware of GOM and can they access it?
-
6. Are current GHIs / GHBs communicated to all applicable staff (check last 2 GHIs - read & sign)?
-
7. Is there a process for monitoring A/C changes?
-
8. Is there a contingency system for internet failure?
-
9. Are staff aware of communication contingency for the office?
-
10. Are normal shift lenghts not longer than 12 hours?
-
11. Do staff have adequate brakes (not shorter than specified in Working Time Directive)?
-
12. Does the operator have an active oversight program (e.g. inspections)?
-
13. Does the training program include manual weight & balance (ask an operator)?
-
14. Are staff aware of incident reporting system?
-
15. Are staff aware of groundsafety.reporting@arelingus.com (if applicable)?
-
16. Are staff aware of contingency process in case of ASTRAL failure?
-
17. Have staff received ERP training (ask staff member)?
-
18. Do staff pro-actively seek information during turnaround (observe)?
-
19. Are staff aware of contingency in case of ACARS failure?
-
20. Do staff use phonetic alphabet to verbally communicate figures?
-
21. Are staff trained up to no less than Cat 10 DG (in line with ICAO technical instructions)?
Notes / Comments / Identified safety or operational improvement opportunities
-
Notes / Comments / Identified safety or operational improvement opportunities