• Aircraft type

  • Blocks on

Terminal

  • First gate agent arrived

  • LIRF Produced with AKH numbers from BILS

  • TCO commences LS preparation, cross checks LIRF against BILS at gate and proceeds to the ramp

  • First inbound guest off (marshalled by TCO)

  • TCO crosschecks LIRF with SL to confirm ULD positions & any changes

  • Last inbound guest off

  • TCO attains Final Fuel for LS

  • First gate announcement

  • First guest on

  • Does TCO manage gate baggage process at the gate?

  • TCO completes DCS loadsheet and issues it via ACARS to the cockpit

  • Shift Leader reconciles LIRF & provides signed NOTOC to TCO at the gate

  • Cabin bags from gate

  • Number of cabin bags taken

  • Last guest on

  • Shift Leader provides signed LIRF

  • LMC amendments calculated (500 kg limit)

  • TCO collects signed LS fom Flight Deck and pulls the bridge

Ramp

  • Hold door closed

  • Tug connected

  • Airbridge/Steps retracted

  • GSE and cones removed

  • Ready to push

  • Actual push

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. Any ratings or scores displayed in our Public Library have not been verified by SafetyCulture for accuracy. Users of our platform may provide a rating or score that is incorrect or misleading. You should independently determine whether the template is suitable for your circumstances. You can use our Public Library to search based on criteria such as industry and subject matter. Search results are based on their relevance to your search and other criteria. We may feature checklists based on subject matters we think may be of interest to our customers.