Information
-
Project/ Site/Dept
-
Location
-
Conducted on
-
Inspection carried out by:
- Leigh Griffiths
- Laura Lee
- Graham May
- Ian Sweeney
- Nancy Holman
- Grant Wordsworth
- Steven Ferrell
- Thomas Enright
- Abigail Bevan
-
Reason for Inspection
- workplace inspection
- accident/incident
- change in legislation
- enforcement notice
- major construction
- near miss
- environmental reporting
- safety audit
- third party
-
Summary/Areas of concern/Good Practice.
Documentation & Administration
1 Documentation and Administration
-
1.1 Actions from last inspection completed
-
1.2 Statutory notices displayed ( HSE Law poster, policy, no smoking sign), Safety Alerts displayed
-
1.3 Aspects & Impacts register in place
-
1.4 Asbestos register on site and displayed
-
1.5 Abstraction and discharge - Licence in place and are these being monitored/ controlled
-
1.6 Are Risk Assessments/SSOW suitable for any activities taken place
Protection to/from others
Protection To/From Others (including Environment)
-
2.1 Fencing, gates and locks appear all in good order. No signs of unauthorised access.
-
2.2 Watercourses/Drainage plans marked up and displayed. Are these areas suitably managed.
-
2.3 Flora and Fauna - Are there provisions for biodiversity. Wildlife and habitats protected. Invasive species identified and managed.
-
2.4 Environmental complaints - noise,dust, odour, vibration
-
2.5 Are lone working procedures being followed
Pathways walkways Roads
3 Pathways, Walkways and Roads
-
3.1 Condition of roads, paths, walkways, mezzanine flooring and gateways maintained.
-
3.2 Is lighting suitable throughout site (internal and external).
-
3.3 Pedestrian access and egress suitable and free from slips and trips. Are they free from moss/ algae growth.
Emergency Arrangements
4 Emergency Arrangements
-
4.1 Emergency Plans and procedures in place and displayed. Fire escape Routes signed and clear from obstruction.
-
4.2 First aid provision suitable stocked. First aider notice displayed
-
4.3 Fire equipment/ extinguishers in place and in good order. Maintenance and testing in place.
Office/Site arrangements
5 Office/Site arrangements (including welfare)
-
5.1 Adequate welfare provisions provided for numbers on site and are these clean and in good working order.
-
5.2 Are offices of adequate space and provided with good ventilation and lighting.
-
5.3 Is housekeeping in good order throughout site/ work area.
-
5.4 Is DSE issues being managed
-
5.5 Buildings/ fixed assets appear in good order with no obvious signs of damage.
-
5.6 Shelving/racking secure and appears in good order.
-
5.7 Guard rails in place to prevent falls from height and appears in good order.
Work Equipment, PUWER, & LOLER
6 Work equipment, PUWER, & LOLER
-
6.1 Lifting equipment and pressure vessels appear in good order. Examination all up to date.
-
6.2 Electrical fixed wiring in good order. Test certificates available and up to date
-
6.3 Portable electrical equipment in good order and with up to date PAT.
-
6.4 Appropriate guarding fitted
-
6.5 Redundant plant (fixed or mobile) managed
-
6.6 Are monitoring/ testing devices in good order and with in date calibration
-
6.7 Vehicle/mobile plant in good order
-
6.8 Work at height equipment in good order and with in date inspection.
Hazardous Substances
7 Hazardous Substances
-
7.1 COSHH/flammable substances being stored correctly and correctly labelled
-
7.2 Chemicals/fuel storage - bund provided In satisfactory condition. Drip trays used where appropriate.
-
7.3 COSHH/DSEAR assessments produced, available and up to date
-
7.4 Chemical/ fuel delivery areas able to contain spill( bud/interceptor).
-
7.5 Are chemical delivery points in good order and locked off. Are emergency showers available and in good order.
-
7.6 Correct spill kit in good condition and in accessible location.
Waste Management
8 Waste Management
-
8.1 Waste management& duty of care documentation in place.
-
8.2 Waste suitable stored separated and labelled.
-
8.3 Hazardous waste bins in place and correctly labelled.
Traffic Management/Street Works
9 Traffic Management
-
9.1 Vehicle traffic routes marked on site/barriers in place. Pedestrian access and egress suitable
-
9.2 Road works/chapter 8 to NRSW requirements being maintained
-
9.3 Information boards/permit numbers displayed
-
9.4 Spoil inside barriers/run off controlled.
Excavations
10 Excavations
-
10.1 Service drawings available, services traced and marked
-
10.2 Excavations stable/shored
-
10.3 Barriers/edge protection in place. Suitable access/egress provided.
-
10.4 Exposed services suitably supported
Health, Manual Handling & PPE
11 Health, Manual Handling & PPE
-
11.1 PPE being used as required and in good order.
-
11.2 Are occupational health issues being suitable controlled(noise,dust,vibration)
-
11.3 Manual handling controlled and managed
Other Observations/Recommendations
12 Other Observation/Recommendations
-
Observation
Observation
-
Priority Report
-
Site/Department
-
Present during inspection:
-
Date of inspection
-
P1 - Serious imminent danger
P2 - Breach of legislation or ACOP
P3 - Does not meet regulatory or company guidance
N/A - Not Applicable -
Agreed actions
Item
-
Priority Code
-
Action/Recommendation
-
Action owner
-
Agreed completion date
Report completed by:
-
Name:
- Leigh Griffiths
- Laura Lee
- Graham May
- Ian Sweeney
- Nancy Holman
- Grant Wordsworth
- Steven Ferrell
- Thomas Enright
- Abigail Bevan
-
Signed:
Report received by:
-
Name:
-
Signed:
-
Date received: