Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Job Site Information

  • Name of Account

  • Project

  • Mix Design

  • Slump Ordered

  • Description of Placement

  • Photo of Job Site

Physical Properties

Physical Properties Test 1

  • Ticket Number

  • Plant Number

  • Truck Number

  • Slump in Inches

  • Percent Air

  • Unit Weight

  • Concrete Temperature

  • Air Temperature

  • Time Batched

  • Time of Test

  • Relative Yield

  • Water Added

  • Was Cylinders Cast By Aggregate Industries

  • Was Cylinders Cast By Test Lab

Physical Properties Test 2

  • Ticket Number

  • Plant Number

  • Truck Number

  • Slump in Inches

  • Percent Air

  • Unit Weight

  • Concrete Temperature

  • Air Temperature

  • Time Batched

  • Time of Test

  • Relative Yield

  • Water Added

  • Was Cylinders Cast By Aggregate Industries

  • Was Cylinders Cast By Test Lab

Physical Properties Test 3

  • Ticket Number

  • Plant Number

  • Truck Number

  • Slump in Inches

  • Percent Air

  • Unit Weight

  • Concrete Temperature

  • Air Temperature

  • Time Batched

  • Time of Test

  • Relative Yield

  • Water Added

  • Was Cylinders Cast By Aggregate Industries

  • Was Cylinders Cast By Test Lab

Physical Properties Test 4

  • Ticket Number

  • Plant Number

  • Truck Number

  • Slump in Inches

  • Percent Air

  • Unit Weight

  • Concrete Temperature

  • Air Temperature

  • Time Batched

  • Time of Test

  • Relative Yield

  • Water Added

  • Was Cylinders Cast By Aggregate Industries

  • Was Cylinders Cast By Test Lab

Physical Properties Test 5

  • Ticket Number

  • Plant Number

  • Truck Number

  • Slump in Inches

  • Percent Air

  • Unit Weight

  • Concrete Temperature

  • Air Temperature

  • Time Batched

  • Time of Test

  • Relative Yield

  • Water Added

  • Was Cylinders Cast By Aggregate Industries

  • Was Cylinders Cast By Test Lab

Critique of Independent testing Laboratory Testing Procedures

  • Make Comments Here

Initial Curing Conditions according to ASTM C 31

  • Has the contractor provided and maintained adequate facilities for safe storage and proper curing of concrete test specimens on the job site for initial curing as required by ACI 301-96 section 1.6.3.2.d.

  • Photo of cylinders curing conditions

Comments and Recomendations

  • Comments

  • Additional Photos

  • Additional Photos

  • Additional Photos

  • QC Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.