Title Page
-
Photo front of house
-
Conducted on
-
Prepared by
-
Lot Number
Pre sheet
-
Site clean and clear access for trades, suppliers and emergency response (if required)
-
VARIATIONS VARIATIONS VARIATIONS - check relevant documents does it all match ihub documents
- Yes
- No
- N/A
-
Electrical - check plans for lights, fans, smoke detectors, switches, fan nogs
-
Plumbing - check plans for mixers, showers, floor wastes, toilet locations pipe
-
Air con - check plans for location of pipe work
-
Check all walls for plumb, level, ceiling line - mark up if required
-
Are all rectification frame items completed
-
Confirm when being completed by relevant trade
-
Roof access marked up and framed out
-
Hallways straight and correct width (check plans and new bca requirements if required)
-
Nogs for toilet roll, shower towel rails, garage door (new bca requirements if required)
-
Bulk heads correct (level & correct height) check kitchen
-
External patio framed out correctly if required
-
External doors fixed and windows installed correctly, check measurements for brickwork internal/ external corners
-
Entry Door locks installed
-
Check rebate for garage door and door width 2100x4800 inside of jambs
-
Notify carpenter
-
Does bin need change over
-
Silt barrier in good condition
-
Notify sediment control for rectification if required
-
Is external cladding / brickwork completed
-
Contact relevant contractor with completion dates (update ihub finish date and leave notes)
-
Temp down pipes or down pipes connected
-
HAS ALL FRAME INSPECTION ITEMS BEEN COMPLETED WITH MULTIPLE SUITABLE PHOTOS FOR CERTIFIER
-
Is there clear safe access for plasterboard delivery? And garage free from materials
- Yes
- No
- N/A
-
Notify relevant trades for RTS and place rubbish in bin