Title Page

  • Cooperative Name

  • Location

  • Conducted on

  • Prepared by

Section 13: Insulating Gloves, Sleeves, and Cover-Up

  • 13.1 Insulating gloves and protectors meet/exceeds applicable OSHA/ASTM standards and the following specifications for use, care, and testing.<br>Criteria:<br>* While factors vary from co-op to co-op, RESAP generally encourages regular testing of all insulated protective gloves every 60 days or less of field use to receive an evaluation of "exceeds" on this assessment question.<br>* To "satisfy" this requirement all insulated protective gloves are tested regularly at a minimum of every 6 months or less of field use (OSHA's minimum requirement), and tested in a manner consistent with applicable standards, and marked with these test dates.<br>* All protectors meet proper size and length requirements, and are found in good condition.<br>* Insulated protective gloves shall be rated for the system's phase to phase primary and secondary distribution voltage(s).<br>* Insulating gloves appear to be in good condition and to have passed visual inspection. <br>* Explicit control in issuing and use for multiple high voltage classes of gloves as well as for secondary voltages exists. <br>* A rotation program is followed to minimize shelf time. <br><br>ref: 1910.137(b)(2)(xii)

  • 13.2 Insulating sleeves meet/exceeds applicable OSHA/ASTM standards and the following specifications for use, care, and testing.<br>Criteria:<br>* While factors vary from co-op to co-op, RESAP generally encourages regular testing of all insulated protective sleeves every 120 days or less of field use to receive an evaluation of "exceeds" on this assessment question.<br>* To "satisfy" this requirement, all insulated protective sleeves are tested regularly at a minimum of every 12 months or less of field use (OSHA's minimum requirement), and tested in a manner consistent with applicable standards, and marked with these test dates.<br>* Insulating sleeves shall be rated for the system's phase-to-phase distribution voltages(s).<br>* Explicit control in issuing and use for multiple voltage classes of sleeves exists.<br>* A rotation program is followed to minimize shelf time. <br><br>ref: 1910.137

  • 13.3 When not in use, insulating gloves and sleeves are stored properly in bags or containers and maintained in an environment protected from excessive light, heat, dirt, and mechanical damage. <br>

  • 13.4 Insulating cover-up materials meet applicable OSHA/ASTM standards and meet the following specifications for use, care, and testing.<br>Criteria:<br>* While factors vary from co-op to co-op, RESAP generally encourages regular testing all blankets, line guards/hoses, hoods and other items used for insulating cover-up on a 6 month maximum rotation and marked with test date to receive an evaluation of "exceeds" requirements on this assessment question. <br>* To "satisfy" this requirement all blankets are tested on a 12 month maximum rotation (OSHA's minimum requirement), and marked with the test date. <br>* Blankets, line guards/hoses, hoods, and items used for electrical insulation are rated for the system's phase-to-phase voltage(s).<br>* Insulating cover-up material appears to be clean and in good condition, and to have passed visual inspections. <br>* Explicit control for classes of blankets, line guards/hoses, hoods, and other insulating cover-up materials exists in multiple voltage systems and a rotation program is followed in issuing cover-up materials. <br><br>ref: 1910.137

  • 13.5 System has more than an adequate supply of cover-up materials to perform the type of job)s being performed with the line designs that the system crews would simultaneously be exposed to.

  • 13.6 Personnel interviewed can explain the proper storage, use, and testing of insulated rubber gloves and sleeves. <br>

  • 13.7 Interviewed personnel can explain the proper storage, use and testing of cover-up materials.

Section 13: Summary

  • 13.8 The overall evaluation of the onsite field observation team for this section of the assessment is as follows:<br>Criteria: <br>* Strong performance - Questions evaluated as exceeds or satisfies all requirements.<br>* Satisfactory performance - Questions evaluated as satisfies all requirements, could be a small number evaluated as exceeds.<br>* Generally satisfactory with minor areas for improvement - Questions evaluated as satisfies all or most requirements, improvement areas are minor<br>* Key attention areas for improvement - Questions evaluated as partially satisfies or fails to satisfy requirements in important improvement areas<br>

AIEC Safety Personnel Signature

  • Stephen Davis

  • Daren Deverman

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.