Title Page

  • Site

  • Location
  • Area

  • Air Cannon Site Name

  • Inspection Date

  • Signature

Air Cannon Details

  • Vessel Serial Number

  • Model Number

  • Type

  • Pressure Relief Valve Number

Air Cannon Assembly External Inspection.

  • Check Transition Pipes are Installed Correctly

  • Check all Bolts are tight and not missing

  • Check Gauge is functioning.

  • Check Pressure Relief Valve (PRV) Works - Pull ring to Test.

  • Check Air-line and Signal line condition

  • Has Air Cannon been fitted with a Non-Return Valve on Supply Line.

  • Check Diffusers are clear and clean

  • Check Valve Sealing Joints, Air Connections, Gauge and Pressure Relief Valve for leaks

  • Check Safety Chain is connected and in serviceable condition.

  • Check Manual Operation of Exhaust Valve, IF SAFE TO DO SO!

  • Check Regulator Pressure. PSI/KPA

Air Cannon Commisioning

  • Is Air Cannon Fit for Commissioning

  • Is Transition Pipe as Designed

  • Has Transition Pipe been Modified from design

  • Why was Transition Pipe Changed

Commissioning

  • Was Air Cannon Operated Manually , Electronically or Both.

  • Did Air Cannon perform as Expected

  • Comments

  • Is Air Cannon Fit for Service

  • If No Why?

Comments or Recommendations.

  • Notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.