Title Page
-
Site
-
Location
-
Area
-
Air Cannon Site Name
-
Inspection Date
-
Signature
Air Cannon Details
-
Vessel Serial Number
-
Model Number
-
Type
-
Pressure Relief Valve Number
Air Cannon Assembly External Inspection.
-
Check Transition Pipes are Installed Correctly
-
Check all Bolts are tight and not missing
-
Check Gauge is functioning.
-
Check Pressure Relief Valve (PRV) Works - Pull ring to Test.
-
Check Air-line and Signal line condition
-
Has Air Cannon been fitted with a Non-Return Valve on Supply Line.
-
Check Diffusers are clear and clean
-
Check Valve Sealing Joints, Air Connections, Gauge and Pressure Relief Valve for leaks
-
Check Safety Chain is connected and in serviceable condition.
-
Check Manual Operation of Exhaust Valve, IF SAFE TO DO SO!
-
Check Regulator Pressure. PSI/KPA
Air Cannon Commisioning
-
Is Air Cannon Fit for Commissioning
-
Is Transition Pipe as Designed
-
Has Transition Pipe been Modified from design
-
Why was Transition Pipe Changed
Commissioning
-
Was Air Cannon Operated Manually , Electronically or Both.
-
Did Air Cannon perform as Expected
-
Comments
-
Is Air Cannon Fit for Service
-
If No Why?
Comments or Recommendations.
-
Notes