Title Page
-
Property & Client
-
Conducted on
-
Prepared by
-
Location
-
Service Visit Type
-
Plant Description
-
Asset Reference
RAMS
-
Risk assessment completed
-
Method statement completed
-
PPE
-
Engineer Initials
SFG 20 Procedure
Unit Filters
-
Check manometer reading and renew filter media as indicated.
Condensate Drains
-
Check for condensate carry-over and that drains are clear
-
Check condition of condensate tray and repaint as necessary, close condensate trap and fill tray to maximum with clean fresh water.
-
Examine and ensure that all drain points and pipework are clear and free from obstruction, clean/disinfect and report drip tray condition.
-
Removed any loose debris using wet and dry vacuum cleaner
-
Ensure that adequate air-break exists between condensate trap and drain to prevent siphoning.
General
-
Visually examine entire unit and check for correct operation. Ensure all brackets, supports, mountings and fixings are in position and secure.
-
Examine for any undue noise, vibration or overheating and report accordingly
-
Ensure all access panels are correctly positioned and secure
-
Examine the unit for water or air leaks.
-
Check and ensure security and integrity of safety guards.
-
Examine AHU flexible connections and ensure security of retaining bands.
-
Where accessible, examine all manually operated valves. Ensure full and free travel and correct setting, checking for leakage.
-
Thoroughly cleaned the interior of the unit and checked for corrosion.
Motorized Dampers & Actuators
-
Check to see that louvers are clear and not obstructed, couplings are secure and that motor runs without excessive noise or vibration.
-
Remotely operate controls to check that actuator operates correctly and in sequence with other interconnected dampers.
-
Examine actuators, dampers and linkages for security and freedom of movement and lubricate as required.
-
Ensure full and free travel and check the integrity of all mechanical linkages.
-
Check condition of all wiring and wiring facilities, ensuring security of terminations.
Frost protection, boost thermostat and controls
-
Check operation.
Fans
-
Check operation of fans
Heating and cooling coils
-
Check condition and clean.
Controls and electrical connections
-
Check operation and condition.
Valves
-
Fully open and close and then reset at the original setting.
Motors
-
Checked all motors in accordance with Motors - Drive Elements (SFG 39-01).
Anti-vibration mountings and duct-work flexible connections
-
Check condition.
Additional Comments
-
Report of any faults
Safety checks
-
Inspection Completed
-
Area left safe
-
Area left clean
Polyteck Building Services, 143 Leman Street, London, E1 8EY
-
Engineer signature