Title Page

  • Site

  • Location of Inspection

  • Prepared by

  • Conducted on

  • Personnel

Requirements

  • Are the latest revision of Jessella Details and Elevation drawings on site and being followed?

  • Are the latest revisions of Rockwool Installation Manuals on site and being followed?

  • Are the latest revisions of Alivas Installation Manuals on site and being followed?

  • Has the Installation Method been read and understood by all operatives?

  • Is the weather being monitored daily?

Substrate

  • Has QA for the SFS & Sheathing Board been completed?

  • Is the area clean and tidy, ready for installation?

  • Have the Cavity Barriers been installed fully, uninterrupted by the Horizontal Barriers?

  • Has any required protection been applied?

Aluminium Flashings

  • Have all flashings been installed line and level as per Jessella drawings?

  • Have the correct fixings been used for the installation?

  • Are the flashings the correct colour/finish and free from damage?

Baserail and Insulation

  • Have the base rails been installed level?

  • Have all corners been mitred?

  • Have base rails been installed using the correct fixings?

  • Have base rails been connected using 'H' connectors?

  • Have insulation boards been cut/rasped correctly?

  • Has the adhesive been applied correctly to the back of the insulation board?

  • Have insulation boards been installed with staggered joints?

  • Have any open joints been filled with a slither of insulation?

  • Have insulation boards been installed with the dense face, facing outwards?

  • Have the insulation boards been installed using the correct fixings following the fixing pattern?

Basecoat

  • Have all beads been installed line and level?

  • Has the basecoat been applied to the correct thickness?

  • Has reinforcing mesh been applied correctly?

  • Does the reinforcing mesh overlap by at least 100mm?

  • Have all stress patches been applied?

  • Have fire pins been installed as required?

  • Has the smoothing coat been applied correctly?

  • Is the finish line and level?

Brickslips

  • Have the brickslips been set out correctly?

  • Have the correct colour brickslips been installed?

  • Has adhesive been applied and trowelled to the wall correctly?

  • Has adhesive been applied and trowelled to back of the brickslip correctly?

  • Have the brickslips been installed line and level using spacers?

  • Were all spacers removed once adhesive had set?

  • Has the area been pointed correctly using the correct mortar?

Site alterations

  • Are there any site alterations?

Drawings

  • Relevant drawings

Comments

  • Are there any comments?

Sign off

  • The below signatures deem all Jessella works mentioned In this report complete to drawings and handed over to RG Group.

  • Checked on behalf of Jessella

  • Checked on behalf of Client

End of inspection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.