Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Executive Summary
-
Job Number
-
CPP Number
-
WPP Number
Induction Process
-
Has the induction been tailored to be site specific
-
Comments
-
Have all personnel and visitors been inducted
-
Comments
-
Is there a record of competences such as PTS, CSCS, CPCS, ICAT, PASMA etc
-
Comments
Documentation
-
Have all actions from previous inspections been closed out
-
Comments
-
Is the CPP, WPP & TBS etc available for inspection against the work activities being undertaken
-
Comments
-
Are the CPP, WPP & TBS's signed, dated & approved by the nominated person for both AMCO & NWR
-
Comments
-
Is the sub-contractors Method Statement and Risk Assessment suitable, sufficient and held on site
-
Comments
-
Does the TBS adequately address risk control measures specific to the site and nature of works, PPE, first aid, emergencies etc?
-
Comments
-
Have the WPP and TBS briefing records been briefed and signed onto on a daily basis
-
Comments
-
Is there a SSOW in effect (RT9909) and has it been signed off by the planner, responsible manager. Does it show contact numbers and has it been issued at least one shift in advance as per the 019 standard.
-
Comments
-
Have control measures been adequately applied on site
-
Comments
-
Design drawings, calculations & specifications present (Approved for Construction) in place along with a drawing register
-
Comments
-
Statutory notices being Current & Displayed;<br>F10<br>H&S Policy<br>Employers Liability Insurance<br>Fire Action Notice<br>Emergency Routes
-
Comments
-
Environmental consents, permits and notifications present?
-
Comments
-
Permits to work (Hot works, dig, spike) fully completed with supporting info
-
Comments
-
Accident Book on site
-
Comments
-
Record of weekly toolbox talks
-
Comments
-
Has the whiteboard been updated, briefed and recorded daily
-
Comments
-
Record of HAVs sheets being recorded and kept on site
-
Comments
-
Has all ITP been completed and all corresponding documentation received by sub-contractor
-
Comments
Contamination
-
Have the correct provisions been taken to avoid contamination
-
Comments
-
Has the site been inspected for any contamination? Spent grit, fuel, oil etc
-
Comments
-
Is there plant and equipment on site to clean any contaminant if identified
-
Comments
-
Have surface drains and gullies been identified in and around site
-
Comments
-
Have they been adequately protected with covers or siting of plant and equipment far enough away etc
-
Comments
-
Do you know who to contact in the event of a large spill. Where is this info held and displayed
-
Comments
-
Is the equipment on site to contain and prevent hazardous waste coming into contact with watercourses
-
Comments
-
Is fuel stored in a segregated vault or gas in a gas cage
-
Comments
-
Is the adequate spill kits available with a kit large enough to contain the largest of possible site spills
-
Comments
-
Is fuel bunded to 110% of the capacity of the largest fuel container
-
Comments
-
Is there adequate plant nappies (preferred other than drip trays) and refuelling funnels
-
Comments
Waste & Waste Disposal
-
Has hazardous waste been identified on site
-
Comments
-
Has the site waste management plan (SWMP) been prepared, updated and completed by relevant parties
-
Comments
-
Have all waste transfer notes and consignment notes been comprehensively completed
-
Comments
-
Have all waste transfer notes been maintained and filled on site
-
Comments
-
Has all chemical waste documents been obtained before allowing waste to be removed from site
-
Comments
-
Has all waste been correctly segregated with relevant signage displayed
-
Comments
-
Has the waste been adequately stored, protected, covered
-
Comments
Material Storage and Handling
-
Has adequate storage facilities been provided for the site
-
Comments
-
Good housekeeping
-
Comments
-
Are products stored safely and protected from damage
-
Comments
-
Are storage facilities easy and accessible
-
Comments
-
Are delivery notes checked, signed and kept on file
-
Comments
-
Are Non-Conforming items reported and quarantined in a safe and segregated area and with appropriate signage
-
Comments
Plant and Equipment
-
Inspected, tested and certified fit for purpose with records kept on site with any expiry dates flagged up
-
Comments
-
Are the operators competent to use the equipment
-
Comments
-
Plant nappies in use
-
Comments
-
Operating areas identified and made safe (exclusion zones etc)
-
Comments
-
Equipment and appliances PAT tested with expiry dates flagged up
-
Comments
-
Equipment calibrated - present and current
-
Comments
Control of Substances Hazardous to Health
-
COSHH & MSDS (Material Safety Data Sheet) available?
-
Comments
-
Risks communicated
-
Comments
-
Are operations/tasks contained
-
Comments
-
Are there suitable controls in place
-
Comments
-
Are the operatives performing the task competent
-
Comments
-
Is there a decontamination unit and is it close to the point of work
-
Comments
-
Is the unit clean and tidy and maintained
-
Comments
Welfare Facilities
-
Adequate toilet and washing facilities in line with NWR Standards
-
Comments
-
Adequate heating, lightning and fire fighting facilities
-
Comments
-
Adequate means of heating, drinking water and food prep area with ample seating
-
Comments
-
Adequate drying facilities
-
Comments
-
Are all welfare facilities clean, tidy and adequately stocked
-
Comments
-
Is there a first aid station with first aiders identified
-
Comments
-
Is there fire Marshall's identified and displayed
-
Comments
Public Safety
-
Is there segregation of the site from the public
-
Comments
-
Is there protection for the public
-
Comments
-
Is the site security adequate and is it maintained
-
Comments
Street / Highway Work
-
Traffic Management Planned and approved
-
Comments
-
Are all highways and pavements free of mud and debris
-
Comments
-
Adequate signage, weighted and maintained
-
Comments
Personal Protective Equipment (PPE)
-
Is all staff wearing mandatory and correct PPE
-
Comments
-
Has task specific PPE been provided
-
Comments
-
Is PPE in good condition and worn correctly
-
Comments
Working at Height
-
Is there adequate access and egress
-
Comments
-
Adequate edge protection
-
Comments
-
All components in place
-
Comments
-
Are a min of 2 lanyards being used when erecting and dismantling
-
Comments
-
Exclusion zones created around working areas
-
Comments
-
Protection in place to prevent falling objects
-
Comments
-
Scaffolding inspected and tagged
-
Comments
-
Competent scaffolders and inspectors. has there been an Independent inspection
-
Comments
Adjacent Line Open (ALO)
-
Has the planning process identified the requirement for ALO
-
Comments
-
Has planning been sufficient to include all those who need to be involved with the ALO planning process
-
Comments
-
Has the ALO work plan been filled in by the relevant parties
-
Comments
-
Has the ALO work plan been authorized
-
Comments
-
Have line blockages been taken for the duration of the work
-
Comments
-
If not working ALO. Has plant, equipment and loads been considered that could become ALO and all restriction measures in place and tested
-
Comments
Noise
-
Is there a section 61 in place and if so is it being considered
-
Comments
-
Is noise monitoring required
-
Comments
-
Have residents been letter dropped in sufficient time
-
Comments
-
Has there been any complaints in relation to noise and vibration
-
Comments
Photographs showing good and un-recommend practice
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
Name and Acceptance of Inspection Representatives
-
Enter Safety Representatives Name and Signature - if present
-
Add signature
-
Enter Site Representatives Name and Signature - if present
-
Add signature