Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Job Number
-
Equipment Make
-
Equipment model
-
Equipment year
-
Hours on machine
-
Equipment Inventory Number
-
Serial Number
-
Ensure AMG decals and www. decal are on machine.
-
Before loading take pictures of machine at the AMG sign at the street
-
Ensure equipment is ready to load (take picture of machine loaded, all sides)
-
Ensure shipping Docs are ready
-
list operator and trucking company loading unit
-
Parts, service and operators manuals
-
Spare tire and rim
-
Decals on machine
-
Reflective tape
-
Close off exhaust
-
Close off intake
-
Cover cab window
-
Steering lock installed
-
Turn off master switch
-
Key given to driver
-
Packing slip
-
Way bill
-
Photos of loaded machine after tied down
-
Send inspection to AMGSHIPPING@amt-inc.ca
EMAIL REPORT
-
Go to start of inspection and share page, there should be a contact page. Select the recipients you wish to share with and once finished click DONE at the top right of the page.