Information

  • Document No.

  • Conducted on

  • Angel Escalante

  • Location
  • Personnel

  • no label
  • If these requirements cannot be physically implemented, then MUTCD PART 6 TEMPORARY TRAFFIC CONTROL standards shall apply as the minimum. The traffic control plans are to be used along with sound judgment. Proper planning, a good safety conscious attitude and full participation from the persons involved in the work zone are all prerequisites to good traffic control. Aspects of the roadway environment such as weather, time of day, traffic volumes, traffic speed, roadway geometry, roadside conditions, and your inventory of traffic control devices should all be considered when implementing the guidelines.

    http://mutcd.fhwa.dot.gov/htm/2009r1r2/part6/part6_toc.htm

Project Overview

  • Work Description:

  • Work Schedule (days, hours)

  • Night Operations?

  • Night Operations Lighting Plan and temporary illumination equipment (except in emergency situations) conforming to the NCHRP Report 476, titled “Guidelines for Design and Operation of Nighttime Traffic Control for Highway Maintenance and Construction” (Bryden and Mace, 2002b) shall be used to illuminate all traffic control stations.

  • Work Duration

  • When the flagger is moving with the operation, all signs associated with the flagger shall be moved ahead whenever the work advances more than two (2) miles from the first advanced warning signs. The 'Flagger Ahead' sign must be within 1500ft of the flagger and the flagger must be seen from the sign. At no time can it be closer then as described in the sign spacing chart.

  • Considering the safety issues inherent to night work, consideration should be given to enhancing traffic controls to provide added visibility and driver guidance, and increased protection for workers, work vehicles, equipment and stationing uniformed law enforcement officers and lighted patrol cars at night work locations where there is a concern that high speeds or impaired drivers might result in undue risks for workers or other drivers.

  • Short-term closures may be allowed without advanced public notification for emergencies or off-peak closure (night closure). Check with the region traffic office prior to implementing the closure.

    Note: Emergency situations are exempt from illumination requirements. For the purpose of this rule, emergency means an unforeseen occurrence endangering life, limb, or property.

  • Traffic Control Plan

  • In general, the procedures illustrated represent minimum solutions for the situations depicted. Except for the notes (which are clearly classified using headings as being Standard, Guidance, Option, or Support), the information presented in the typical applications can generally be regarded as Guidance.

  • TCP (Attach Photos)

  • Modifications To Fulfill Special Needs

  • Approved traffic control plans (TCP) are required for flagging, as with all work zones, and the flagging station must be incorporated into and be an integral part of the TCP. If the approved TCP’s in the M54-44 or other approved plans do not adequately address a specific work zone, the Region Traffic Office should be contacted to assist with developing an acceptable TCP.

  • TCP (Attach Photos)

  • Modifications To Fulfill Special Needs

  • On-Site Forman (Name, Company, Phone)

Site Conditions

  • Night Conditions

  • Night Hours: 1/2 Hr before sunset to 1/2 Hr after sunrise

    For nighttime flagging, flaggers shall be illuminated by an overhead light source providing a minimum vertical illuminance of 10 fc (108 lux) measured 1 ft (300 mm) out from the flagger’s chest. Lighting systems with flood, spot, or stadium type luminaire(s) shall be a minimum of 10 ft (3 m) above the pavement and shall be aimed downward at the work and rotated outward no greater than 30 degrees from nadir (straight down). Luminaire(s) shall be shielded to minimize glare to approaching traffic and trespass light to adjoining properties.

    A supply of emergency flares shall be on-site for use in the event of unanticipated situations such as traffic accidents, equipment breakdowns, failure of lighting equipment, etc. .

  • Worksite (Attach photos)

  • Weather

  • Road Type

  • Traffic Volume

  • Work Location

Traffic Control Procedure

  • Job Briefing Prior To Work

  • High Visibility Apparel / PPE

  • Traffic control personnel shall wear high-visibility safety apparel (Vest and Pants) that meet Class III requirements of the ANSI/ISEA 107-2004, a high-visibility hard hat that meets ANSI Z89.1 Class E (Electrical) requirements – Marked with at least 12 square inches of retroreflective material applied to provide 360 degrees of visibility, a 24" retroreflective stop/slow paddle that complies with MUTCD standards, two-way radio communication and safety footwear. Safety eyewear is also recommended.

  • Traffic Control Method

  • Signaling / Communication

  • Law Enforcement

  • Purpose:

  • Comments: (be as specific as possible).

Traffic Control Setup and Audit

  • Primary Transition

  • Workzone Audits

  • Audit
  • Completed:

Traffic Control Zones

  • Advanced Warning Area

  • Transition/Taper Area

  • Activity/Buffer Area

  • Termination/Taper Area

  • Overall Effectiveness

Traffic Control Devices

  • Advance Warning Signs

  • Channelizing Devices

  • Lighting Devices

  • Overall Effectiveness

Incident Report

  • A traffic incident is an emergency road user occurrence, a natural disaster, or other unplanned event that affects or impedes the normal flow of traffic.

  • Was there an incident to report?

  • When did it happen?

  • Where did it happen.

  • Was anyone hurt?

  • Name, Address, Phone

  • Where we're they treated?

  • Was an Incident Investigation Completed?

  • Is Root Cause Analysis Required?

Analysis and Key Take-Away

  • Key Take-Away: (be as specific as possible).

  • Suggestions: (be as specific as possible).

Review and Sign-off

  • Reviewed By

  • Approved By

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.