Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Description of Work Carried Out
-
DNO
-
DNO Substation
-
Report Type
-
1. General periodic inspection
-
1.2. Thermographic Inspection of the installation
-
1.3. Cleaning protection and control buildings
-
1.4. General Visual inspection of access and perimeter compound.
-
1.5. Inspection of state of oxidation and general painting of equipment.
-
2. Current and voltage transformers maintenance
-
2.1. Inspection of primary and secondary earth connections
-
2.2. Thermographic general inspection of transformer
-
3. Power & auxiliary transformers maintenance
-
3.1 Inspection of local temperatures, earthing connections, bushing, abnormal sounds
-
3.2 Inspection of general oil level and filters
-
3.3 Visual Inspection of general equipment (Buchholz, oil level, thermal image)
-
3.4 Thermographic analysis of Bushings connections, auxiliary tanks, Silica-gel breathings, etc.
-
3.5 Chromatographic analysis of gases dissolved in oil
-
3.6 Physico-chemical analysis of the oil
-
3.7 Furan Analysis
-
3.8 Oil Dielectric
-
3.9 Replacement of Silica Gel and Oil filter
-
3.10 Operational test and indication check
-
3.11 Oil level inspection Auxiliary Transformer
-
3.12 Inspection of Silica Gel Auxiliary Transformer
-
3.13 Chromatographic analysis of gases dissolved in oil Auxiliary Transformer
-
3.14 Physico-chemical analysis of the oil Auxiliary Transformer
-
3.15 Oil Dielectric Auxiliary Transformer
-
3.16 General Inspection Auxiliary Transformer
-
4 Disconnectors and motor controls maintenance
-
4.1. Inspection of earthing connections, number of<br>operations and status indicator
-
4.2. Inspection of Auxiliary Switches, local and remote signalling
-
4.3. Electrical and mechanical operative test
-
4.4. On load Thermographic inspection
-
4.5. Heaters inspections
-
5. Circuit Breakers and switchgears cabins maintenance
-
5.1. Inspection of earthing connections, number of<br>operations and status indicator
-
5.2. Inspection vents entries, heating and ventilation
-
5.3. Electrical and mechanical operative test
-
6. Additional Checks
-
Test transformer fans 6 monthly inspections
-
To run 132-33KV Transformer Auxiliary cooling up to<br>confirm correct operation
-
Test heating working correct within Auxiliary control<br>cabinet and Tap Changer control cabinet
-
Check SF6 Gas pressure on switchgear at intake
-
Check Dehumidifiers / Air condition /Heating / pumps<br>within the Substation
-
Check and record any recent protection operations and<br>reset relays
-
Visual inspection of 132kV Lines/Apparatus/disconnectors.
-
Visual inspection of compound bonding/Earthing to<br>apparatus and continuity
Inspection Summary
-
Oil Samples Taken Y/N
-
Silica Gel and Oil filter condition
-
Comments:
-
Power Transformers maintenance - ON LOADS TAP CHANGER
-
Operational test
-
Comments:
Completion
-
Remedial Works Completed
-
Safety Concerns:
-
Signature