Title Page
-
#316865
-
AntiVibe Damping Compound Quality Control
-
Television academy
-
Conducted on
-
Prepared by
-
Location
-
Antonio Estrada
Preparation
-
Verify all surfaces are clean and free of oil and debris.<br>
-
Confirm surface/air temperature is above 40 degrees.
-
Verify adequate sprayer and equipment is used and working properly, i.e. Hoses, tips, safety valves, etc.
-
Ensure damping compound is mixed thoroughly.
Application
-
Verify all surfaces of the metal are fully coated.
-
Verify all corners and edges are fully coated.
-
Inspect damping compound after application to ensure consistency.
Mil/Gauge Requirements
-
20ga. = 51mil
-
Actual:
-
Add media
-
18ga. = 68mil
-
Actual:
-
Add media
-
16ga. = 85mil
-
Actual:
-
Add media
-
14ga. = 107mil
-
Actual:
-
Add media
-
Verify that all damping compound has fully dried before applying any material over the compound.
-
Add signature