Title Page

  • #316865

  • AntiVibe Damping Compound Quality Control

  • Television academy

  • Conducted on

  • Prepared by

  • Location
  • Antonio Estrada

Preparation

  • Verify all surfaces are clean and free of oil and debris.<br>

  • Confirm surface/air temperature is above 40 degrees.

  • Verify adequate sprayer and equipment is used and working properly, i.e. Hoses, tips, safety valves, etc.

  • Ensure damping compound is mixed thoroughly.

Application

  • Verify all surfaces of the metal are fully coated.

  • Verify all corners and edges are fully coated.

  • Inspect damping compound after application to ensure consistency.

Mil/Gauge Requirements

  • 20ga. = 51mil

  • Actual:

  • Add media

  • 18ga. = 68mil

  • Actual:

  • Add media

  • 16ga. = 85mil

  • Actual:

  • Add media

  • 14ga. = 107mil

  • Actual:

  • Add media

  • Verify that all damping compound has fully dried before applying any material over the compound.

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.