Title Page

  • Report Type: (ALO Checklist)

  • Conducted by:

  • Date:

  • Week No.

  • Principal Contractor/Delivery Unit:

  • Contractor (if applicable):

  • Team:

  • Project Title:

  • Location of Work:

  • ELR & Mileage:
  • Nature of Work:

  • Lines at Site:

  • ALO Authorisation No:

  • ALO Responsible Manager/Senior On Call Manager:

  • Planned Control System to be Used:

  • Type of Plant in use & ID Numbers:

  • Plant Hire Company:

  • Name of ALO Site Coordinator:

  • Work Activity On/Off Track:

  • Construction/Rail Vehicle:

ALO Working Checklist

  • Practice and guidance: NR/GN/RMVP/0200, Section 9.7 - Any Line Open to Traffic

  • The ALO Site Co-ordinator is the person responsible for testing, implementing and monitoring the ALO control measures on site

1) Verify that the ALO Site Co-ordinator has a copy of the authorised ALO work plan and demonstrate that this plan matches the detail on site:

  • Please Explain:

2) Verify through Q&A with the following personnel that they have received a briefing and understand the ALO control measures as detailed in the ALO work plan and a test of these control measures has been completed prior to work commencing:

ALO Site Coordinator:

  • Briefing/Understanding:

  • System Test:

Banksman (for construction sites)

  • Briefing/Understanding:

  • System Test:

Machine/Crane Controller:

  • Briefing/Understanding:

  • System Test:

Machine Operator:

  • Briefing/Understanding:

  • System Test:

POS Representative:

  • Briefing/Understanding:

  • System Test:

Slinger, or any other staff involved with load stabilisation:

  • Briefing/Understanding:

  • System Test:

3) Through your observation, are the personnel that are operating and managing plant complying with the control measures that are identified on the ALO Work Plan?

  • Please explain:

4) Are the personnel that are managing and operating RRVs utilising duplex communication equipment to control plant movements?

  • Please explain:

5) Is the ALO Site Coordinator actively monitoring the implemented control measures for plant that is working alongside lines open to traffic?

  • Please explain:

6) Are you satisfied that the ALO Control Measures are adequate to protect the safe passage of trains on open lines?

  • Please explain:

Additional Information/Comments

  • Comments:

Signature

  • Signature:

  • Date & Time:

  • Position:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.