Report Type: (ALO Checklist)
-
Conducted by:
-
Date:
-
Week No.
-
Principal Contractor/Delivery Unit:
-
Contractor (if applicable):
-
Team:
-
Project Title:
-
Location of Work:
-
ELR & Mileage:
-
Nature of Work:
-
Lines at Site:
-
ALO Authorisation No:
-
ALO Responsible Manager/Senior On Call Manager:
-
Planned Control System to be Used:
-
Type of Plant in use & ID Numbers:
-
Plant Hire Company:
-
Name of ALO Site Coordinator:
-
Work Activity On/Off Track:
-
Construction/Rail Vehicle:
ALO Working Checklist
-
Practice and guidance: NR/GN/RMVP/0200, Section 9.7 - Any Line Open to Traffic
-
The ALO Site Co-ordinator is the person responsible for testing, implementing and monitoring the ALO control measures on site
1) Verify that the ALO Site Co-ordinator has a copy of the authorised ALO work plan and demonstrate that this plan matches the detail on site:
-
Please Explain:
2) Verify through Q&A with the following personnel that they have received a briefing and understand the ALO control measures as detailed in the ALO work plan and a test of these control measures has been completed prior to work commencing:
ALO Site Coordinator:
-
Briefing/Understanding:
-
System Test:
Banksman (for construction sites)
-
Briefing/Understanding:
-
System Test:
Machine/Crane Controller:
-
Briefing/Understanding:
-
System Test:
Machine Operator:
-
Briefing/Understanding:
-
System Test:
POS Representative:
-
Briefing/Understanding:
-
System Test:
Slinger, or any other staff involved with load stabilisation:
-
Briefing/Understanding:
-
System Test:
3) Through your observation, are the personnel that are operating and managing plant complying with the control measures that are identified on the ALO Work Plan?
-
Please explain:
4) Are the personnel that are managing and operating RRVs utilising duplex communication equipment to control plant movements?
-
Please explain:
5) Is the ALO Site Coordinator actively monitoring the implemented control measures for plant that is working alongside lines open to traffic?
-
Please explain:
6) Are you satisfied that the ALO Control Measures are adequate to protect the safe passage of trains on open lines?
-
Please explain:
Additional Information/Comments
-
Comments:
Signature
-
Signature:
-
Date & Time:
-
Position: