Hazard and Risk Management
-
Have all relevant permits been issued for critical work?
-
Is there a suitable hazard and risk board with current hazards and critical risks recorded weekly?
-
Have SWMS been developed and monitored by persons carrying out critical work activities?
-
Have daily pre start meetings been carried out for persons carrying out critical work activities.
-
Are the latest weekly HS&E minutes and Arrow Safety Alerts / lessons learnt displayed in a central location?
Housekeeping / Welfare
-
Work areas clean, tidy and accessible
-
Serviced fire extinguishers and stocked First Aid kits in place
-
Holes securely guarded or covered
-
Material and plant safely stored
-
Clean toilets and smoko sheds
-
Hazardous substances stored safely
-
Safe access / egress to all areas
Occupational Health
-
Are there controls in place to protect workers from exposure to noise, dust asbestos and toxic contamination
-
Have noisy work operations been isolated from others?
-
Is there adequate levels of natural ventilation / air dilution
-
Have dusty working areas been isolated from others
-
Have power tools been fitted with suitable dust extraction
-
Are concrete cut off saws etc. fitted with water suppression controls
-
Are vacuums being used instead of dry sweeping
-
Is the worker and others working close by wearing the correct PPE e.g. eye, hearing and respiratory equipment?
-
Are floor areas clean and free from of all types of dust
Environmental Management
-
Are there suitable silt controls in place
-
Is there a spill control kit in place
-
Are all stockpiles controlled with silt fences
-
Are site vehicles kept to defined haul roads
-
Are all drains and gutters clear
-
Is there a specific hand tool wash down area
-
Is dust controlled
-
Are noise levels being monitored as and when required
-
If required, Is there a truck tyre wash system in place
Scaffolding & Mobile Towers
-
Scaffold erected by competent person
-
Safe access to scaffold platform
-
Adequate guard rails and toe boards
-
Adequately secured to the building
-
Internal and mid guard rails in place
-
Fully boarded out working platform
Personal Protective Equipment
-
Mandatory PPE worn by all employees
-
Task related PPE worn (eye, ear, etc.)
-
Suitable respirator for the task
-
All PPE stored when not in use
Electrical
-
Electrical leads in good condition and tagged
-
Tools in good condition, guards
-
Commercial splitter box with RCD
-
Safe position of electrical cables and leads
Welding & Gas Cutting
-
Hot works permit issued/shields used
-
Extinguisher nearby / correct PPE
Work Equipment
-
Work Benches set up correctly & safe
-
Tool guards are secured and effective
-
Angle grinder guard and handle in place
-
Angle grinder operating dead man switch
-
Adequate lighting for work bench
-
Cutting areas isolated from others
Ladders & Step Ladders
-
Ladders secured and correct angle
-
Projects 1m above step off point
-
Commercial step ladder being used
-
Step ladder being used correctly
-
No one standing above top 2 rungs
-
No defects to ladder or step ladder
Excavations
-
Excavation permit issued before dig
-
Underground services identified
-
Safe access to excavation provided
-
Excavation sides battered correctly
-
Protection barriers - deep excavation
-
Effective shoring and trench box
Mobile Plant
-
Fitted roll over protection & seatbelt
-
Competent and/or trained operators
-
Warning devices operating correctly
-
Dangerous parts correctly guarded
Cranes / Hiabs
-
Lifting area isolated from others
-
Current test certificate displayed
-
Chains /slings certified & current
-
Trained crane and/or hiab Operator
-
All loads correctly secured/ chocked
-
Lifting Plan agreed and implemented
Mobile Elevated Working Platforms
-
Daily inspection sheet in place and up to date.
-
MEWP permit complete and signed off by subcontractor
-
High risk areas isolated by means of barriers or other
-
Outriggers used as required / suitable ground condition
-
Safe Working Load not exceeded by operator / materials
Work at Height
-
All fall hazards controlled by Elimination or Isolation controls
-
Fall arrest/restraint systems in place
-
Above installed by a competent person
-
Employees trained in harness use
-
Harness and lanyards in safe condition
-
Emergency rescue plan in place
Temporary Works
-
Is there safe access to the formwork
-
Attached scaffold erected by scaffolder
-
Shore loading frames / props plumb
-
Acrow props vertical and secured
-
Panel props secured to flat surface
-
Panel props capable of securing the load
Safety Nets
-
Are the nets in good condition
-
Is the net clear of any debris
-
Are there any visible damage to the safety net system e.g. cuts or fraying of the mesh cord or tie ropes
-
Are all gaps between net and structure less than 100mm
-
Are anchor points intact and in good order
-
Are nets attached to the structure / anchor points correctly
-
Has the net been used to arrest a fall or had a load imposed on it. If yes, restrict use immediately.
-
Reviewed by Project Manager / Director
-
Closed Out (agreed actions have been completed and this situation is now satisfactory)
-
Reviewed by Project Manager / Director