Information
-
Document No.
-
Stage
- Wates inspection
- Anthology inspection
-
Tower
- Tower 1
- Tower 2
-
Level
- level 1
- level 2
- level 3
- level 4
- level 5
- level 6
- level 7
- level 8
- level 9
- level 10
- level 11
- Level 12
- Level 13
- Level 14
- Level 15
- Level 16
- Level 17
- Level 18
- Level 19
- Roof
-
Apartment Ref
- Apt 1
- Apt 2
- Apt 3
- Apt 4
- Apt 5
- Apt 6
- Apt 7
- Apt 8
-
Conducted on
-
Client / Site
-
Prepared by
-
Personnel in attendance:
STAGE:
Inspection check list
-
Stage
-
Rooms cleaned out.
-
Windows de taped
-
All windows clean
-
Flooring installed & protected
-
Bedroom 1
-
Bedroom 2
-
Living Room
-
Bathroom Sanitaryware completed
-
Bathroom
-
Tiling to bathroom completed.
-
Kitchen installed complete
-
Kitchen
-
All ceilings defect free
-
Doors and frames fitted correctly.
-
Ironmongery fitted
-
All skirting fitted correctly.
-
HIU cupboard completed
-
Lobby Area
-
Mastic completed
-
All lighting installed and working
-
All sockets level and secure
-
Photos are available for this inspection or handover.
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Inspected by :