Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
CCL & Berkeley Controls Excessive Energy Survey for Argos Stores
Identified By Argos
General Information
-
Engineers Name
-
Date and Time of Survey
Store Details
-
Store Name
-
Store Number
-
Store Address
-
Store Managers Name
-
Explain to Store Manager process and confirm reason for visit
-
Managers Comments/Concerns regarding current system
-
Picture from outside of Store
Store Opening Hours
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Saturday
-
Sunday
-
How Is the Lighting Being Controlled
-
Is Lighting within Store Area Satisfactory
-
Is Lighting within Stock Room/ Back of House Area Satisfactory
-
Are all Lighting Areas satisfactory when dropped to Key switch Level
EMP Information
-
External Pictures
-
Internal Pictures
-
EMP Build Date
-
Spare Trading Circuits Available (Inc. contactors/MCB Ways and terminal space)
-
Spare Keyswitch Circuits Available (Inc. MCB Ways)
-
Spare Essential MCB Ways available (Detail number of 3phase/ 1phase ways available for future use)
-
Is Time clock Working
-
Is Time clock set correctly
-
Is the Time clock being overridden regularly or permanently ?
Time clock Settings
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Saturday
-
Sunday
HVAC information
-
External Pictures
-
Internal Pictures
-
is all plant controlled from panel interfaced with LMO as a minimum requirement
-
HVAC Build Date
-
HVAC Time Clock set correctly
HVAC Time clock settings
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Saturday
-
Sunday
Location of HVAC to EMP
-
Basic diagram of cable run
-
Brief description of cable run
-
Distance in Meters (approx)
AC (Heating and Cooling Plant)
-
Is AC controlled via Trading Signal
-
Picture of Outdoor unit (including Name plate)
-
Picture of Indoor Units
-
Information on AC (make, model numbers etc)
-
Are there any Interfaces fitted (KRP, 3 wire adaptors)
-
Interfaces required to interface AC
-
Picture of Hand Controller
-
Location of Hand Controllers
-
Brief description of work required to interface AC
Problems/Issues found
-
Issue 1 Photo
-
Issue 1 information
-
Issue 2 Photo
-
Issue 2 Information
-
Issue 3 photo
-
Issue 3 Information
-
Issue 4 Photo
-
Issue 4 information
Clamped Loads
Before issue circuits isolated
-
L1
-
L2
-
L3
After Issue Circuits Isolated
-
L1
-
L2
-
L3
-
Engineers Signature
-
Select date