Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
CCL & Berkeley Controls Touch Screen Timeclock Survey for Argos Stores
Identified By Argos
General Information
-
Engineers Name
-
Date and Time of Survey
Store Details
-
Store Name
-
Store Number
-
Store Address
-
Store Managers Name
-
Explain to Store Manager process and confirm reason for visit
-
Managers Comments/Concerns regarding current system
-
Picture from outside of Store
Store Opening Hours & Store Operational Hours
-
Please provide store opening hours and also the hours the store is occupied by staff (please provide any info below in text box i.e HUB store/Staff Patterns/Outside hours deliveries).
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Saturday
-
Sunday
-
How Is the Lighting Being Controlled
-
Is Lighting within Store Area Satisfactory
-
Is Lighting within Stock Room/ Back of House Area Satisfactory
-
Are all Lighting Areas satisfactory when dropped to Key switch Level
-
Photos of Lighting split when dropped to KS
EMP Information
-
External Pictures
-
Internal Pictures
-
EMP Build Date
-
Is Time clock Working
-
Is Time clock set correctly
-
Is the Time clock being overridden regularly or permanently ?
-
Preferred Location for TSTC
-
Is there space within the EMP to fit the Relays and Transformer for TSTC
Time clock Settings
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Saturday
-
Sunday
HVAC information
-
External Pictures
-
Internal Pictures
-
is all plant controlled from panel interfaced with LMO as a minimum requirement
-
HVAC Build Date
-
Information regarding the HVAC control. (LMO, Trading signals/ INNOTECH/ ELECTRO Controls ?)
-
If Innotech Controls fitted has a back-up been taken
-
PLEASE FORWARD TO CCL FOR RECORDS
-
HVAC Time Clock set correctly
HVAC Time clock settings
-
Monday
-
Tuesday
-
Wednesday
-
Thursday
-
Friday
-
Saturday
-
Sunday
Location of HVAC to EMP
-
Are there any spare cores available between HVAC and EMP panels
-
Basic diagram of cable run
-
Brief description of cable run
-
Distance in Meters (approx)
-
Is any additional containment required
AC (Heating and Cooling Plant)
-
Is AC controlled via Trading Signal
-
Picture of Outdoor unit (including Name plate)
-
Picture of Indoor Units
-
Information on AC (make, model numbers etc)
-
Are there any Interfaces fitted (KRP, 3 wire adaptors)
-
Interfaces required to interface AC
-
Picture of Hand Controller
-
Location of Hand Controllers
-
Brief description of work required to interface AC
Special Equipment Required for Installation
-
List of Special Parts required for Install (Blanking Labels/Containment etc.)
-
Dimensions of Blanking Labels Required
-
Engineers Signature
-
Select date