Title Page

Date

Arrival in to

Voyage number

Voyage number

Inspection

The checklist must be completed by the designated officer. The master or OOW should be kept informed of the progress of the checks. The master must be informed of the checks outstanding at least 1nm from the port entrance. All items must be positively sighted by or reported to the person completing this form.

Point Echo (Dover only)

Pier Heads

15 Minutes to Shop

15 Minutes to ECR

10 Minutes to Master

5 Minutes to ECR

Radars set up for arrival

Hand steering, 4 pumps, responsive

Red light

Stand by Engines
Port Control gave permission to enter:

Permission to berth, number:

Bridge team brief

Call harbour stations

Info - final approach

Bow Thrusters running

Pitch response

ECR Checklist complete

Fins

Anchors cleared, forward comms

Aft Comms

Manoeuvring mode engaged

Master advised Checklist is completed. OOW Signature
Master's signature
SBE time
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.