Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Main Task
- Environmental Clean
- Clean Removal
- Encapsulation
- Ancillary
- Supervisory
- Waste Handling
-
Asbestos Material
- amosite
- chrysotile
- crocidolite
-
Asbestos Type
- Asbestos insulation board
- textured coating
- insulation
- flock
- debris
- gaskets
- cement based
- lagging
- sprayed coating
-
Types of vist
- priority
- un announced
- planned
-
Job Notified?
PLANNING AND DOCUMENTATION
-
Has the supervisor completed all pre start checklists?
-
Is there a site information board displaying the site POW, pictorial flow chart and emergency procedures?
-
Is there a copy of the POW including the ASB5, risk assessment and method statement on site?
-
Are the risk assessments suitable, sufficient and relevant to the outside activities?
-
Have they been read and understood and have they signed?
-
Does the ASB5 match the POW?
-
Is there a copy of the asbestos licence & waste carriers licence on site?
-
Is a copy of general procedures guide available on site?
SITE SPECIFIC DETAILS
-
Does the site layout agree with the drawings and photos and include the correct enclosure sizes and locations?
-
Is the supervisor on site the one listed in plan of work?
-
Is the scope of works/methodology/material adequately described in the plan of work?
-
Does the plan of work detail when the work is to be carried out? (including start/finish times and weekend variations)
-
Does the plan of work detail the air monitoring arrangements for the duration of the works?
-
Does the plan detail the person or company providing the 4stage clearance and to whom they are contracted to?
-
If the plan of work has been amended, has it been signed/dated and do other records (e.g site diary) show the authorisation procedure has been followed?
-
Does the plan of work detail the type of respirators to be used?
-
Does the plan of work detail the arrangements for smoke testing and witnessing? Has this been witnessed?
SAFE SYSTEMS OF WORK
-
Are only trained operatives operating MEWPS
-
Are they operating in a safe manner
-
Scaffolds inspected, signed off and paper work available (if applicable)
-
Tower scaffold erected by competent PASMA trained operative
-
Hop ups in good condition and tested
-
Is all electrical plant PAT tested and in good condition
SUPERVISORS & OPERATIVES
-
Asbestos Training : Medical : Face fits : Mask Sheet :
-
Asbestos Training : Medical : Face fits : Mask Sheet :
-
Asbestos Training : Medical : Face fits : Mask Sheet :
-
Asbestos Training : Medical : Face fits : Mask Sheet :
-
Asbestos Training : Medical : Face fits : Mask Sheet :
-
Are RPE checks been carried out in line with Standard procedure i.e. Daily
HYGIENE FACILITY/DECONTAMINATION UNIT
-
Are the gas installation and safety certificates and the air clearance certificate for the DCU available?
-
Is the DCU connected to the enclosure?
-
Is the transit procedure in accordance to the plan of work?
-
Is the outside of the unit clean?
-
Are there sufficient DCU's/showers for the number of personnel on site? (1shower: 4persons)
-
Is the DCU setup correctly I.e. legs down, is it level, is it connected to the mains water and power? Is the unit adequately earthed?
-
Is there visible warning signs on the external clean/dirty entry doors?
-
Have lockers been provided in the clean end?
-
Are there adequate methods of heating the DCU in cold weather?<br>
-
Do the showers have adequate supply of hot water?
-
Is there a gas detector fitted?
-
Are all doors (internal and external) self closing?
-
Is the waste water from the DCU filtered and discharging to foul sewer or sealed container?
-
Does the DCU have an extraction fan fitted with a HEPA filter fitted on the dirty external wall? (does it have a current DOP/electrical test cert)
-
Are the latest emergency evacuation instructions posted in the clean end of the DCU?
-
Has DCU the check sheet been completed?
-
Have liquid soap, shampoo, nail brushes and clean dry towels been provided for the thorough decontamination of the removal personnel?
-
Are hooks available in the shower to hang RPE whilst showering?
-
Are the sinks and waste system clean of dust?
-
Is flooring worn to a level that ingrained dirt cannot easily be removed?
-
Is the NPU and area underneath clear of dirt and in a dry condition? Can you see the flow meter
-
Are there sufficient, working power points in the clean end to charge RPE battery packs?
-
Is the DCU set up correctly in accordance with above?
-
Are gas bottles stored correctly?
SITE PREPARATION
-
Has all non-contaminated loose equipment and material been removed from the working area?
-
Have all floor ducts, risers, electrical sockets and other openings been covered and sealed inside the area?
-
Has a supervisor confirmed all openings in plant, pipes, walls & ceilings (including hidden voids) been sealed?
-
Has all electrical plant been isolated or effectively protected from the ingress of water or surfactant materials?
-
During preparation/sheeting is the correct PPE & RPE being used?
-
Are all Gentoo Construction employees / representatives wearing supplied logo clothing? Is it clean? Do they look and act 'professional'?
AIRLOCK/BAGLOCK
-
Does airlock consist of at least 3 (1x1x2m) compartments with vision panel (600x300mm located in dirty end?
-
Is the outer flap in place.
-
Are the flaps weighted at the bottom and taped?
-
Do the flaps overlap and cover the openings?
-
Is there a hand held spray in the dirty end?
-
Is the airlock tidy and free of all dust, dirt and debris?
-
Does the airlock have suitable signage?
-
Is there a baglock? If not, please state reason why? If yes does it consist of at least 3 (1x1x2m) compartments with vision panel (600x300mm) located in dirty ends?
WORK AREA/ENCLOSURE
-
Is the enclosure constructed in accordance with the general procedures (1000 gauge ploy; 50mm2 timber or use cleanable surfaces of area) and as per the POW?
-
If flame retardant polythene is required by POW, is it being used?
-
Has a clear Perspex inspection/viewing pale (600x300mm min) or CCTV been incorporated into the enclosure?
-
Are all parts of the enclosure visible via the panel(s) or CCTV?
-
Are the work areas/enclosures on carpet? If so, has boarding been used to overlay the carpet?
-
Are there sufficient ASBESTOS warning signs displayed around the area?
-
Is site clean, tidy and free from hazards
PPE
-
Are the asbestos removal operatives wearing full coveralls, with a hood (type 5/6) in accordance with the POW?
-
Ae they wearing gloves and Wellington boots?
-
Are the overalls on the outside of their boots?
-
Are their hoods on the outside of their RPE harness strap
-
If a transit procedure is being operated, are work and transit overalls of a different colour
-
Are the masks worn as stated in the POW?
-
If any personnel are entering the area or have just exited the DCU, are they clean shaven?
-
Is any other PPE required on site and is it being used?
CONTROL MEASURES: - DUST REDUCTION/WET STRIPPING
-
Is the system being used in accordance with that specified in the plan of work?
-
Is the system set up and working?
-
Satisfied that the dust levels are being reduced to the lowest practicable levels?
-
Do the results of personal air monitoring indicate that the methods used are effective?
-
Are the surfactants/wetting agents only been used on cold surfaces?
-
Are exposure records available on site?
NEGATIVE PRESSURE UNITS
-
Does the unit(s) extract from the enclosure at a point far enough away from the airlock enclosure as possible to ensure good air flow through the enclosure without any dead spaces, or is a roving head in place? Is the sufficient negative pressure?
-
Is NPU(s) correctly sheeted to enclosure wall, or if inside, sheeted over including vent hose?
-
Does the unit(s) vent to atmosphere outside the building? Or if venting inside, is regular air monitoring being undertaken?
-
Does the pre filter look to be working efficiently?
-
Does the unit(s) have DOP/electrical test certificates?
-
Is the ducting in good condition?
H TYPE VAC's
-
Is there one in the area near the airlock for decontamination?
-
Are the hoses and electric flex in good condition?
-
Are the vacuum cleaners working efficiently?
-
Have they got current DOP/electrical test certificates?
WASTE HANDLING & DISPOSAL
-
Is there a suitable waste disposal route for the bags with suitable signage?
-
Are the bags marked in accordance with the current legislative requirements?
-
Is the waste double bagged?
-
Are bags being overfilled?
-
If waste is being temporarily stored, is the area labelled and secure?
-
What condition is the skip? Is it lockable? Are suitable signs present?
-
Does the waste route follow the one in the plan of work?
TRANSIT PROCEDURES
-
Is transit footwear available and is it stored in clean section of airlock?
-
Are the sufficient pairs for the number of people in the work area?
-
Are transit coveralls stored in clean end of airlock?
-
Does the transit route go over 'exposed' carpeted areas?
-
Is there signage to show transit route?
-
If site is occupied (other trades etc) is transit route barriered off or are personnel accompanied?
AIR MONITORING ARRANGEMENTS
-
Is the company and regime identified in the POW undertaking the air monitoring?
-
Is a visual inspection carried out by the supervisor once the stripping is complete?
COMMUNICATION
-
Is there a suitable system in place to allow easy two-way communication between workers inside the enclosure and those working outside the enclosure?
EMERGENCY PROCEDURES- are they in place/available for:
-
Fire procedure
-
Medical emergency inside the enclosure?
-
Loss of electric power?
-
Failure of the enclosure?
VAN REGISTRATION
-
Are all light lenses present (is it legal)?
-
Is there signs of body work damage
-
If so has it been reported?
-
Overall condition
- good condition
- slight damage
- heavy damage
-
Is the outside of van clean?
-
Is there any sign that smoking has taken place inside the vehicle?
-
Is all plant been stored safely and correctly
-
Is storage area clean and well ordered? NB if there are masks hung up or loose, this is 3pts
ADDITIONAL COMMENTS, GOOD PRACTICES & CORRECTIVE ACTIONS
-
Add drawing
-
Enter any non conformance
-
Enter good practices
-
Supervisors comments
-
Auditor
-
Supervisor