Information
-
Site address
-
Job no.
-
Client
-
Conducted on
-
Prepared by
-
Personnel
-
Main Task
- Environmental Clean
- Clean / Removal
- Encapsulation
- Ancillary
- Suervisory
- Waste Handling
-
Asbestos Material
- Sprayed Coating
- AIB
- Insulation
- Cement
- Textured Coating
- Gaskets & Rope
- Floor Tiles
-
Asbestos Type
- Amosite
- Chrysotile
- Crocidolite
- Actinolite
- Anthophylite
- Tremolite
-
Job Notified?
HYGIENE FACILITY/DECONTAMINATION UNIT
-
Is the DCU/Modular Unit operational? (This includes adequately earthed, all legs down and level)
-
If the DCU is on unsuitable ground i.e grass. Is adequate protection being used to ground the DCU (Ply sheets)
-
Is the outside of the unit clean?
-
Are there suitable warning signs on the external clean/dirty entry doors?
-
Is the NPU and area underneath clear of dirt and in a dry condition? (Is the flow meter visible?)
-
Is the waste water from the DCU filtered and discharging to foul sewer?
-
Is the water and waste inlet hose in good condition?
-
Are adequate adapters/connector being used for the water inlet and waste pipe?
-
Are all doors (internal and external) self closing?
-
Is there a carbon monoxide detector fitted within the DCU?
-
Are the gas installation and Electrical test, air clearance certificate and DOP certificate for the DCU available?
-
Has the DCU log diary been completed from the previous project?
-
Are the latest emergency evacuation instructions posted in the clean end of the DCU?
-
Have lockers been provided in the clean end?
-
Are there sufficient, working power points in the clean end to charge RPE battery packs?
-
Are there adequate methods of heating the DCU in cold weather?
-
Is there sufficient warning signs on the internal clean end to shower door?
-
Are there sufficient DCU's/showers for the number of personnel on site? (1shower: 4persons)
-
Do the showers have adequate supply of hot water?
-
Have liquid soap, shampoo, nail brushes and clean dry towels been provided for the thorough decontamination of the removal personnel?
-
Are all seals (wall to floor, wall to wall sinks etc) in place?
-
Are hooks available in the shower to hang RPE whilst showering?
-
Is flooring worn to a level that ingrained dirt cannot easily be removed?
WORK AREA/ENCLOSURE
-
Is the enclosure constructed in accordance with the SOP's?
-
If flame retardant polythene is required by POW, is it being used?
-
Has a clear Perspex inspection/viewing panel (600x300mm min) or CCTV been incorporated into the enclosure?
-
Are all parts of the enclosure visible via the panel(s) or CCTV?
-
Are the work areas/enclosures on carpet? If so, has correx/polythene been used to protect the carpet?
- No, there are no carpets within the areas/enclosures
- Yes, there is carpets but has not been covered/protected.
- Yes, there is carpet and they have been protected with correx/polythene
-
Are there sufficient ASBESTOS warning signs displayed around the area?
AIRLOCK/BAGLOCK
-
Does airlock meet the minimum size requirement?
-
Is the outer flap in place.
-
Are the flaps weighted at the bottom and taped?
-
Is there sufficient airlock flap deviation to indicate adequate airflow throughout the airlock?
-
Do the flaps overlap and cover the openings?
-
Is there a hand held spray in the third stage?
-
Is the airlock tidy and free of all dust, dirt and debris?
-
Does the airlock/baglock have suitable signage?
-
Is there a baglock? If yes does it consist of at least 3 (1x1x2m) compartments with vision panel (600x300mm) located in dirty ends?
-
If no baglack is present, is the absence of a baglock justifiable by site constraints?
-
Is the bag lock big enough for the waste size being removed?
-
Is there a spray bottle in the baglock?
-
Is the baglock free from visible asbestos debris?
PPE
-
Are the asbestos removal operatives wearing full overalls, with a hood (type 5/6, Category 3)?
-
Are good practices observed? (i.e masks not being hung around the neck when not being worn)
-
Are they wearing gloves and Wellington boots?
-
Are the overalls on the outside of their boots?
-
Are their hoods on the outside of their RPE harness strap
-
If a transit procedure is being operated, are work and transit overalls of a different colour
-
Are the masks worn as stated in the POW?
-
If any personnel are entering the area or have just exited the DCU, are they clean shaven?
-
Is any other PPE required on site and is it being used?
SITE PREPARATION
-
Has all non-contaminated loose equipment and material been removed from the working area?
-
Have all floor ducts, risers, electrical sockets and other openings been covered and sealed inside the area?
-
Has a supervisor confirmed all openings in plant, pipes, walls & ceilings (including hidden voids) been sealed?
-
Has all electrical plant been isolated or effectively protected from the ingress of water or surfactant materials?
-
During preparation/sheeting is the correct PPE & RPE being used?
NEGATIVE PRESSURE UNITS
-
Does the unit(s) extract from the enclosure at a point far enough away from the airlock enclosure as possible to ensure good air flow through the enclosure without any dead spaces, or is a roving head in place?
-
Is there sufficient negative pressure?
-
Additional air inlets suitability positioned and in use? where applicable.
-
Is NPU(s) correctly sheeted to enclosure wall, or if inside, sheeted over including vent hose?
-
Does the unit(s) vent to atmosphere outside the building? Or if venting inside, is regular air monitoring being undertaken?
-
Does the pre filter look to be working efficiently?
-
Have the unit(s) been DOP/electrical tested within the last 6 months? (Evidence of testing sticker on the machine)
-
Is the ducting in good condition?
CLASS-H- VACUUM CLEANERS
-
Are there a minimum of 2 x H Type vacuum cleaners on site?
-
Is there one in the area near the airlock for decontamination?
-
Have the VAC(s) been DOP/electrical tested within the last 6 months? (Evidence of testing sticker on the machine)
SITE SPECIFIC & PLANNING
-
Is there a copy of the POW including the ASB5 & risk assessments on site?
-
Has the POW been read, understood and signed by all employees? (Including handover by management)
-
Does the ASB5 match the POW?
-
Does the site layout agree with the drawings and photos and include the correct enclosure sizes and locations?
-
Is the supervisor on site the one listed in plan of work?
-
Is the scope of works/removal method/asbestos material adequately described in the plan of work?
-
Are the risk assessments suitable, sufficient and relevant to the on site activities?
-
Does the plan of work detail when the work is to be carried out? (including start/finish times and weekend variations)
-
Does the plan of work detail the air monitoring arrangements for the duration of the works?
-
Does the plan detail the person or company providing the 4stage clearance and to whom they are contracted to?
-
If the plan of work has been amended, has it been signed/dated and do other records (e.g site diary) show the authorisation procedure has been followed?
-
Does the plan of work detail the type of respirators to be used?
-
Does the plan of work detail the arrangements for smoke testing and witnessing?
-
Has the smoke test been witnessed by the person stated on the POW?
-
Is there a suitable system in place to allow easy two-way communication between workers inside the enclosure and those working outside the enclosure?
EMERGENCY PROCEDURES- are they in place/available for:
-
Medical emergency inside the enclosure?
-
Loss of electric power?
-
Breach of the enclosure?
CONTROL MEASURES: - DUST REDUCTION/WET STRIPPING
-
Is the dust suppression method being used suitable for the asbestos being removed?
-
is the dust suppression method being used in accordance with that specified in the plan of work?
-
Is the dust suppression system set up and working?
-
Satisfied that the dust levels are being reduced to the lowest practicable levels?
-
If personal air monitoring has been conducted on this project, does the results indicate that the methods used are effective?
-
Are the surfactants/wetting agents only been used on cold surfaces?
-
Are exposure records available on site?
TRANSIT PROCEDURES
-
Is transit footwear available and is it stored in stage 1 of the airlock?
-
Are there sufficient pairs for the number of people in the work enclosure/area?
-
Are transit coveralls stored in stage 1 of the airlock?
-
Is the transit route on carpet? If so, has correx/polythene been used to protect the carpet?
-
Is there adequate signage along the transit route?
-
If site is occupied (other trades etc) is transit route barriered off or are personnel accompanied?
WASTE HANDLING & DISPOSAL
-
Is there a suitable waste disposal route for the bags with suitable signage?
-
Are the bags marked in accordance with the current legislative requirements?
-
Is the waste double bagged?
-
Are bags being overfilled?
-
If waste is being temporarily stored, is the area labelled and secure?
-
Is the skip in good condition and labelled with sufficient signage?
-
Is the skip lockable?
-
If the waste is being transported via van, is there suitable sealed compartment/lockable container to keep waste separate from equipment?
-
Does the waste route follow the one in the plan of work?
DOCUMENTATION
-
Has the supervisor completed the pre-start checklist HB03?
-
Is there a copy of the asbestos licence & waste carriers licence on site?
-
Is there a copy of HB Standard operating procedures on site?
-
Has a visual inspection been carried out by the site supervisor prior to handing over to the analyst?
-
Is there copies of DOP/PAT testing certificates on site? (PAT testing spreadsheet)
SUPERVISORS & OPERATIVES
-
Supervisor - Asbestos Training : Medical : Face fits : Mask Sheet :
-
Operative 1 - Asbestos Training : Medical : Face fits : Mask Sheet :
-
Operative 2 - Asbestos Training : Medical : Face fits : Mask Sheet :
VAN REGISTRATION
-
Has the van on site been air tested within the last 2 months?
-
Is the outside of van clean?
-
Is storage area clean and well ordered?
ADDITIONAL COMMENTS & CORRECTIVE ACTIONS
-
Please enter comments -
-
List contract managers non conformances and points -
-
Auditor
-
Supervisor