Information
-
Document No.
-
Site Address
-
Job Reference Number
-
Completed
Existing Conditions
-
Please photo and record any aspects of the site that you feel need highlighting before work commences. This can include, but not limited to;
- Broken or damaged ceiling tiles
- Broken or damaged hatches / doors
- Rubbish / mess in risers
- Broken or damaged paving slabs / bricks -
Photographs
-
Confirm ground will be scanned where digging / disturbance required?
-
Confirm walls/floors will be scanned where drilling required?
-
Have you reviewed asbestos register?
-
Seek asbestos register from Project Manager
-
Are you confident that ACM will not be disturbed as part of installation works?
-
Do not proceed with any disturbance works. Seek guidance from Project Manager
Sign Off
-
We/I acknowledge the safe system of work provided and will work to the control measures outlined. Where the task deviates significantly from the Safe System provided we/I will raise with Project Manager to authorise.
-
Engineer 1
-
Engineer 2
-
Engineer 3