Title Page
-
Document No.
-
Audit Title
-
Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Add Component Picture or Observation
Picture
-
Add media
-
Add Sketch
-
Previous Inspection Report
-
Select date
-
Add media
-
CMMS Details- PPM
-
Frequency of Maintenance
-
Telemetry Digitals
- Mains Power
- Backup Power
- Level Downstream Hi
- Level Upstream Hi
- Hydraulic Fault
- Hydraulic Pressure
- Hydraulic Pump Trip
- Hydraulic Oil Temp
- Hydraulic Valve Fault
- Gate Healthy
- Gate Failed to Move
- Gate Opening
- Gate Closing
- Control System Healthy
- PLC Health
- PLC Watch Dog
- Motor Overload
- Other Alarm see Text
-
Other Alarms
-
Telemetry Analogues
- Level Upsteam
- Level Downstream
- Gate Position
- Other See Text
-
Other Alarms
-
Other Notes