Title Page

  • Inspection Date

  • Review Date

  • Site Location
  • Client

  • Team

  • Completed by

  • Job Title


  • INSTRUCTIONS:
    -------------------------------------
    1. Answer "Yes", "No", "N/A" for the questions below.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link.

  • Previous site inspection

  • Previous inspection date , if applicable.

  • All previous items closed

1. Management of Health and Safety

  • 1.2 RAMS signed by operatives on site?

  • 1.3 Training and toolbox talks and site inductions?

  • 1.1 Are risk assessments and method statements (RAMS) on site?

2. Safe Systems

  • 2.1 Are the installers working to method statement procedures?

  • 2.2 Does there appear to be cooperation and coordination between trades?

3. Workplace

  • 3.1 Is there safe access to and from the working area?

  • 3.3 Is the working area adequately protected?

  • 3.4 Is waste removed from the working area and stored safely?

  • 3.5 Is equipment safely stored?

  • 3.6 Are the risks from slips, trips and falls satisfactory?

  • 3.7 Are vehicles parked appropriately?

  • 3.8 Is traffic well managed?

  • 3.9 Are the welfare facilities in good order?

  • 3.10 Is lighting satisfactory?

  • 3.11 Do residents appear to be adequately protected from the works?

4. First Aid

  • 4.1 Adequate first aid provision?

  • 4.2 Is a person appointed to take charge in an emergency?

5. Work Equipment

  • 5.1 Is all the work equipment suitable for its intended use?

  • 5.2 RCD’s for Chargers and transformer?

  • 5.3 Are all portable appliances inspected and tested?

  • 5.4 Is there any mobile access equipment and is it suitable – towers, etc?

6. Environmental and COSHH

  • 6.1 COSHH assessments contained within RAMS?

  • 6.2 Waste segregated where necessary?

  • 6.3 Asbestos – arrangements on site, satisfactory?

  • 6.4 Is dust suppressed adequately?

  • 6.5 Are face masks available?

  • 6.6 Are noise levels generally acceptable?

7. Manual Handling

  • 7.1 Is manual handling being carried out safely?

  • 7.2 Is manual handling at a minimum?

8. Personal Protective Equipment

  • 8.1 Correct PPE worn? Hi vis, Boots, Hard hat, glasses, Gloves Ear defenders

  • 8.2 If there is additional PPE , is it being used correctly

9. Work at Height – Fall protection fall prevention, are any of the following being used? (if not - N/A).

  • 9.1 Scaffold

  • 9.2 Towers

  • 9.3 Ladders and steps

  • 9.4 Hop ups

  • 9.5 Is the planning of work at height generally acceptable?

Comments

  • Comments

Completion

  • Issued to

  • Date

  • Signed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.