Title Page
-
Inspection Date
-
Review Date
-
Completed by
-
Operations Manager and Health & safety
Site Details
-
The site is located at Saxon Square, Luton LU2 0SX
-
Site overview photo
-
John Sullivan is site manager, Chris Hillery is lead supervisor..
-
Site team (those on site at the time of this audit).
-
Brief description of what and where the works are being carried out today.
-
INSTRUCTIONS:
-------------------------------------
1. Answer "Yes", "No", "N/A" for the questions below.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share report by exporting as PDF.. -
This is audit version - 4.5 (effective 07/11/18) some minor amendments.
-
Previous site inspection
-
Previous inspection date , if applicable.
-
All previous items closed
1. Management of Health and Safety
-
Are risk assessments and method statements (RAMS) available?
-
RAMS signed by operatives on site?
-
Have RAMS been reviewed within the last month?
-
Are the installers working to method statement procedures?
-
Are toolbox talks frequent and relevent to the work or current issues?
-
Recent topic?
-
Does there appear to be cooperation and coordination between trades?
-
Have there been any accidents, incidents or near-misses reported?
-
Have the issues been recorded or investigated?
-
Please create an action to close-out.
-
Is there any other health and safety information required from the client?
2. Workplace Safety
-
Is there safe access to and from the working area?
-
Is the working area adequately protected?
-
Are unnecessary materials removed from the working area and stored safely?
-
Is equipment safely stored?
-
Are the risks from slips, trips and falls satisfactory?
-
Are the welfare facilities in good order?
-
Is lighting satisfactory?
-
Are people generally segregated from moving plant and machinery on site?
-
Are deliveries considered safe?
-
Are there any other workplace hazards that prevent safe working?
3. First Aid and Emergency Procedures
-
Is a person appointed to take charge in an emergency?
-
Are there adequate systems in place for fire safety and do they appear to be updated to reflect changes in site layout?
-
Are there escape routes and is the assembly point clearly identified?
-
Adequate first aid provision?
4. Work Equipment
-
For access equipment see section 8.
-
Is all the work equipment suitable for its intended use?
-
Is all equipment appropriately tagged and recorded in the Site Safety File?
-
Is any further user training required for work equipment used?
-
Is there an RCD available for cordless chargers or transformers?
-
Are all portable appliances inspected and tested?
-
Next test due
-
Are there any lifting operations or lifting equipment? e.g stillages etc?
-
Briefly describe any lifting conditions.
-
Is lifting generally safe?
-
Are stillages being returned to HO regularly?
5. Materials, Environment and COSHH
-
Are COSHH assessments contained within RAMS?
-
Have any new substances been introduced to site that are not contained in the RAMS?
-
Are materials, i.e. frames, glass and ancilleries stored appropriately?
-
Is waste segregated where necessary?
-
Is there anything else that may give rise to an environmental issue?
6. Health
-
Is manual handling being carried out safely?
-
Is manual handling at a minimum?
-
Are noise levels generally acceptable?
-
Has an indicative noise sample been carried out?
-
Indicative sound level (informally taken from a smartphone app) dBA
-
Is drilling kept to a minimum ,reducing the effects of HAVS?
-
Is dust suppressed adequately?
-
Are face masks available?
-
Are there any other issues that may affect the health of the workforce?
7. Personal Protective Equipment
-
Is the five-point PPE site policy adhered to?
-
Is PPE suitable for the task and used appropriately?
-
If there is additional PPE required for a specific task?
8. Work at Height – Fall prevention, protection and falling objects.
-
Scaffold
-
Towers
-
Ladders and steps
-
Hop-ups (Hop-ups minimum requirement is 600 x 600mm platform)
-
Podium
-
Other (e.g. easi-dec, staging board etc).
-
Does there appear to be anyone working over/under the work area?
-
Can this be avoided?
-
Carry out a point works risk assessment, discuss with other parties and agree an alternative course of action.
-
Is the planning of work at height generally acceptable?
-
Are installers working safely at height?
-
Ensure that the issue is immediately resolved or cease works and create an action overcome the problem.
Comments
-
Comments
-
Add media
Completion
-
Is the site, working area and the people working on or near window installations considered safe?
-
Are there any further actions required?
-
Actions to close-out.
-
Issued to
-
Date
-
Signed