Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
Client Details
-
Client name
-
ATM ID
-
Site Name
-
Site contact
-
Phone
-
Address
-
Address (map)
-
Trading hours
Standard ATM Security Requirements
-
UL291 rated safe
-
Cencon lock required
-
4x red head dyna bolts required
Ram Raid Prevention
-
Ram raid prevention
-
If yes provide details
-
Ram raid prevention measures
- Bollards
- Location
- Raminator
- Anchor Chain
- Other
-
Ram raid prevention details required eg: bollard spacing required, where in the site, etc...
-
Comments re: ram raid prevention
-
In no ram raid prevention requirement details required
-
Ram raid prevention requirements
- Bollards
- Location
- Raminator
- Anchor Chain
- Other
-
Ram raid prevention requirements details required: bollard spacing, reasons for Raminator, anchor chain, another location, etc..
-
Comments re: ram raid prevention requirements
Alarm System Information
-
Is there an alarm system installed?
-
Is the alarm system monitored by a grade 1A monitoring centre?
-
Name of company monitoring alarm
-
Is the ATM covered by a PIR detector?
-
Will a security patrol respond to alarms within a reasonable timeframe?
-
If the site does not have an alarm system or the alarm system is not monitored by a grade 1A monitoring centre an independent alarm system installed into the ATM is required
-
Is an independent alarm system required?
Gas Attack Defence
-
Will a gas suppressant be required?
-
If gas suppressant required, explain reasoning for recommendation
Other Information
-
Will the ATM be installed on concrete flooring?
-
Is there adequate lighting covering the ATM?
-
Are the any issues with drilling into the floor?
-
Has there been a burglary at site within the previous year?
-
If yes, provide details
-
Details of burglary (if required)
Non Conforming Floors
-
If the floor is not concrete this section is required to be completed
-
What type of flooring is there? (if not concrete)
-
Is there underfloor access?
-
Is the underfloor access restricted to authorised personnel only?
-
Is a C channel required
-
Is a U bracket required?
-
Can a concrete slab with a minimum width of 150mm greater than the ATM and 200mm thick be poured/installed into the proposed ATM location?
EH&S
-
Installation - Are there any EH&S issues that need to be raised?
-
List the EH&S issues that need to be raised with regards to the installation
-
Servicing - Are there any EH&S issues that need to be raised?
-
List the EH&S issues that need to be raised with regards to servicing
Photographs / Site Maps
-
Photograph of the location of the ATM
-
Photograph of the surrounding area of the ATM
-
Insert site map eg: emergency evacuation plan (if applicable)
-
Photograph of areas of concern (if required) - Details required!
-
Site diagram (if required)
Assessment Details
-
Date assessment completed
-
Assessment completed by
-
Signature