Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Check list Ref : ATO.CM.003 Organisation 2018
-
Audit date :
Size and complexity
Non complex organisation
-
EASA Reference ORA.GEN 200(b) & AMC1 ORA.GEN 200(b)
-
ATO Reference OMM 1.2.19/2.3
-
Is organisation still classified as a non complex organisation
Post holders' Qualifications
-
EASA Reference ORA.GEN.210 (c)
-
ATO Reference Man power analysis (Excel data file)
-
Do Post Holders' Qualifications match EASA regulations and ATO Manuals?
-
Does the organisation have the appropriate ressource in term of man power?
Instructors Qualifications
-
EASA Reference ORA.ATO 100 (c) (e) (f)
-
ATO Reference TRM 1.4 to be transferred in OMM
-
Is the required number of Instructors met?
-
Do the instructors meet minimum required qualifications?
Record of Qualifications
-
EASA Reference ORA.GEN 2220 & AMC1 ORA.GEN 220(b)
-
ATO Reference TRM 1.6 / OMM 1.2.18/ OMM 1.2.19.2
-
Does the organisation has a Record Keeping policy
-
Does the organisation record Students files?
Students records
-
Is student contract signed in the file?
-
Is Personal DATA form ATO.SPD.001 in the file?
-
Is Student EASA Assessment Form EASA.ATO.SAF in the file ?
-
Is Student EASA training Form ATO.STR.001 in the file?
-
Is Passport Copy in the file?
-
Are licences and Medical in the file (when required)?
-
Does the organisation record instructors files?
Instructors Records
-
Has TKI been supervised during the year ?
-
Is supervision scheduled prior TKI delivers his/her course?
-
Is resume/CV in the file?
-
Is Acceptance form ATO.IAF.001 in the file?
-
Is Instructor selection Process ATO.ISP.001 in the file?
-
Is ATO.MSS.001 Signed in the file?
-
Is Employment Contract signed in the file?
-
Are copies of Licences and Medical (if applicable) in the file?
-
Does the organisation record Post holders files?
Documentation
Structure & content
-
EASA Reference ORA GEN.200 (a) 5 AMC1ORA GEN.200 (a) 5
-
ATO Reference OMM preamble/ OMM 1.2.1/ OMM 1.2.2/ OMM 1.2.3
-
Does OMM displays a statement from AM untable manager to confirm that the organisation will continuously work in accordance with the applicable requirements
-
Is scope of activitivies described?
-
Are nominated persons referred?
-
Is organisation chart described?
-
Is a genral description of facilities described?
-
Are procedures specifying how the organisation ensures compliance with the applicable requirements described?
-
Is a Process to amend documentation described and applied?
Structure
-
Does OM and TRM exist and content met ?
-
Documentation
-
Does OM and TRM OM available for staff?
-
Does OM describe flight time limitations?
Changes
Change to Organisation
-
EASA Reference ORA.GEN 130 / GM1 ORA.GEN.130
-
ATO Reference OMM 1.2.5 / 1.2.6 ATO.NCO.001 / OM 4.3 CMS training Course
-
Is Application for an organisation certificate described? How to appply ?
Notification of change
-
Is a Process defined to apply for a change when prior approval not required
-
Is a Safety Assessment applied
-
Is a process defined for a change requiring a prior approval described ?
-
Are ATO's Staff informed about change requiring prior approval?
-
Is a Change requiring prior approval defined ?
Findings
Notification of findings by EASA
-
EASA Reference ORA.GEN.150
-
ATO Reference OMMOMM 2.6.4/ OMM 2.6.5
-
Is an Identification of the root cause of non-Compliance in place?
-
Is a corrective action plan procedure defined?
-
Is a Recurrence mitigation plan (RCA) in force?
-
Demonstrate corrective action plan identification within the agreed period
Immediate reaction to safety problem
-
EASA Reference ORA.GEN.155
-
ATO Reference OMM 1.2.13
-
Does ATO describe how to take into account EASA safety recommandation?
-
Does AM provides all required means to apply these recommandations?
-
AAA not really exposed to direct Aerial risk
Audit outcome
-
Findings
-
Root Cause Analysis
-
Corrective action Plan (CAP)
-
Responsible for CAP
-
Due date
Safety Assessment
-
Is safety impacted?
-
Ia a Safety Event raised?
-
Safety Event reference?
Audit performance completion
-
Has the audit been conducted on time?
-
What is the Root cause analysis?
-
Are more ressources required?
-
Is AM informed?
-
Date
-
Audit performed by: