Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SITE APPEARANCE
-
First impression
-
Roads around the site clean
-
Clean footpaths
-
Clean gutters
-
Onsite and offsite rubbish removed
-
Excess materials removed
PAVEMENTS
-
Concrete paths free of cracks and defects
-
All expansion foam level and neat
-
All exposed concrete neat and evenly exposed
-
Concrete playground beams no defects
GARDEN BEDS
-
Neat and free of litter
-
Free of weeds and all small weeds have been sprayed
MULCHING
-
Organic mulch is level and raked evenly
-
Inorganic mulch is level and compacted
PLANTS AND TREES
-
All plants appear healthy
-
All trees appear healthy<br>
-
All trees are staked
-
All trees are straight <br>
-
All bamboo stakes are removed
-
All nursery tags have been removed
-
Follow up watering has been arranged
EDGING
-
All edging is straight
-
All finished levels meet the edging neatly
GRASSING
-
Hydroseeding has good coverage
-
All overspray is cleaned,
-
Turfing is cut in correctly
-
Turf joins are neat and tidy.
-
Ongoing watering has been arranged
FENCING and BOLLARDS
-
All bollards are free of damage
-
Fencing is straight
-
Cable / piping is secure
-
Gates installed correctly
-
Locks on removable bollards
-
Clean with no signs of excess concrete
-
Staining is bollards is neat and has good coverage
FURNITURE / FEATURES / STRUCTURES
-
No damage to seats or benches
-
No damage to picnic tables
-
No damage to bins
-
No damage to BBQ
-
Structures have building permit sign off
-
Rock walls are neat and present well
-
Timber walls are strictly with no defects
-
Drinking fountain works
IRRIGATION
-
Pipes are buried<br>
-
System is working and programmed
-
Controller is secure
MISC
-
Playgrounds are correct and signed off by auditor if required
-
Rock work is neat with i sharp edges
-
All rock work is stable and doesn't move
ADDITIONAL GENERAL NOTES
-
Project Supervisor
-
Project Manager