Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

General

  • Project / Site Name

  • Supervisor / Foreman at time of this inspection

  • Select site weather conditions at time of this inspection (select all that apply)

  • Describe weather conditions on site today

  • Temperature and humidity on site currently

  • What are the current activities being undertaken on site?

Site Safety Inspection

First Aid Facilities

  • Are first aid facilities to be inspected in this audit?

  • Main Contractor first aid facilities and first aid box locations are known to all workforce operating on behalf of Avi Contracts Ltd?

  • Workforce are aware of the procedures in case first aid is required?

  • Are emergency numbers displayed?

Fire Prevention & Emergency

  • Are fire and emergency procedures to be inspected in this audit?

  • Evacuation plan displayed and understood by the workforce and have been discussed regularly especially when site set up changes including new entry and exit points?

  • Exits clear of obstructions?

  • Emergency exit lighting operable with adequate direction notices?

  • Extinguishers in place, clearly marked for type of fire and clear of obstructions?

  • Any concerns that affect the fire and emergency procedures to date have been highlighted and raised in writing (email) to the Main Contractor?

Site Security

  • Is site security to be inspected in this audit?

  • Are site entry and exit points clearly designated?

  • Is clear signage requiring visitors to check in posted?

  • Are all entries and exits closed and locked at night and during weekends?

  • All workforce have signed in and out of the site security and used these measures adequately?

  • All tools are safely stored away over night in tool boxes. If other measures are being used (i.e. chain and padlock) please state in comments.

Personal Protective Equipment (PPE)

  • Is Personal Protective Equipment to be inspected in this audit?

  • Is head protection worn correctly with Avi Contracts signage?

  • Is correct forms of eye protection worn where required?

  • Is hearing protection worn in designated areas?

  • Are the correct forms of hand protection worn for manual tasks

  • Is respiratory protection worn where dust, mist or fumes are present?

  • Do all operatives have FF8 masks?

  • Are operatives using FF8 masks where required?

  • Has the correct paperwork been completed for the Qualitative Fit Testing Employee Record?

  • Are FF8 mask filters being logged and checked for usage?

  • Are all operatives wearing FF8 masks clean shaved?<br>

  • Is footwear in good condition and of correct type?<br>

  • Are high-vis vests or clothing worn at all times with Avi Contracts signage including supervisors designate high-vis?

Housekeeping

  • Is site housekeeping to be inspected in this audit?

Work Benches & Areas

  • Work benches and areas to be inspected in this audit?

  • Work benches are clear of rubbish and debris?

  • Are tools not in use put away?

  • There are no damaged hand tools in use?

  • There are no damaged power tools in use?

  • Work height correct for the type of work and the worker?

  • Work benches have no sharp edges?

  • Workers are communicating clearly at acceptable volume (no shouting)?

  • Noise produced by work activities is within acceptable parameters and is not excessive?

Storage Design and Use

  • Site storage to be inspected in this audit?

  • Are materials stored in racks and bins wherever possible?

  • Are materials stored away in designated areas correctly and neatly and floors surrounding storage clear of obstructions?

  • Storage designed to minimise lifting problems?

  • Doors are stored upright correctly to prevent damage?

Waste & Rubbish

  • Waste and rubbish to be inspected in this audit?

  • Are bins/dumpsters located at suitable points around site?

  • Is site generally orderly, with rubbish or waste materials disposed of correctly?

  • Are oily rags and combustible refuse disposed of in covered metal containers?

Trip and Fall Safety

  • Trip and fall safety to be inspected in this audit?

  • Are floor surfaces even and uncluttered?

  • Are entry and walkways kept clear, adequate and clearly marked?

  • Are floor surfaces free of liquid spills?

  • Are railings and footpaths in good condition?

  • Are fall preventive measures in place and used where gaps occur in railings? i.e. barriers or harnesses?

  • Is all fall protection equipment is visually inspected prior to use?

  • Is all work above 2m, or within 2m of an edge being done safely?

  • Are all floor openings fully barricaded or are protected with a secured cover and labelled?

  • Are personnel below protected from falling materials (i.e. tools, bolts, etc.)?

Scaffolding

  • Scaffolds to be inspected in this audit?

  • Are scaffolds generally safe and orderly (free of unstable propping objects etc)?

  • Are scaffolds accessible and clear of unstable objects and trip hazards?

  • Is scaffold adequately secured to building (or appropriately secured with alternative method)?

  • All concerns with the scaffolding have been raised and cleared with the Main Contractor. If any concerns were raised please write in comments?

Hazardous Manual Tasks

  • Hazardous Manual Tasks to be inspected in this audit?

  • Have Hazardous Manual Tasks on site been identified and RAMS in place for these works?

  • Are suitable controls in place for repetitive tasks? If yes, please state in notes box.

  • Are relevant workers trained in these controls? If yes, state training and where it is documented?

Hand and Power Tools

  • Hand and power tools to be inspected in this audit?

  • Are all tool guards in place and operable?

  • Are power cords in good condition?

  • Are all power tools in good condition?

  • Are defective pieces of equipment and tools red tagged and removed from service?

  • If yes, has Avi Site Management been been notified, if yes who and when?

  • Are employees using the proper tool for the task they are performing?

  • Are dust collectors and exhausts provided on tools that produce large amounts of dust?

  • Are dust collectors and exhausts in good condition? If no, what is being done to replace them?

General Machinery, Plants and Equipment

  • General Machinery, Plants and Equipment to be inspected in this audit?

  • If required, are relevant pre-start inspections being completed on machinery, equipment and plants?

  • Are all plant and equipment on hire (i.e. Speedy) in working condition and safe for operatives to use?

  • Are relevant tags and documentation in place for on hire plant and equipment?

Access

  • Access to be inspected in this audit?

  • Are all ladders/ hop up's Industrial strength? (Non Household rated, check label.)

  • Are ladders / hop-up's in good condition?

  • Are all towers and podiums erected correctly and to the levels of PASMA training?

  • Are all access methods safe and free from any risks of injury or harm?

  • Access when not in use is stored away correctly with all the relevant components kept together.

Electrical Safety

  • Electrical safety to be inspected this audit?

  • PAT Testing for the project is in order, up to date and all tools are safe for use.

  • Has portable equipment been tested and tagged regardless of whether it has passed or failed? Including in date stickers.

  • There are no failures for the PAT testing to report. If no, please state what has failed.

  • There are no power leads across walkways?

  • No frayed or damaged leads?

  • Leads aren't strained?

  • Are portable power tools in good condition?

Chemical Safety

  • Chemical safety to be inspected this audit?

  • Are all hazardous substances and chemicals being used identified in the COSHH assessment all being stored and used as per the procedures set out?

  • Are workers trained in the use of hazardous substances?

  • Are eye washes and showers available and easily accessible?

  • Are spill kits or other clean up arrangements available?

Confined Spaces

  • Confined spaces safety to be inspected this audit?

  • Do all applicable confined space works have adequate permits granted and documented?

  • Is a confined space emergency plan in place?

  • Are confined spaces being continually monitored?

  • Are all workers undertaking confined space works trained in confined space entry and activities?

Incident, Injury & Accident Procedures

  • Incident, Injury & Accident Procedures to be inspected this audit?

  • Are Incident, Accident, Near Miss and Injury procedures in place?

  • Are adequate reporting forms for these events in place?

  • Are all incidents investigated?

  • Are Corrective Actions then implemented with site team informed via a tool box talk of any hazards and risks to look out for?

  • All onsite medical forms have been completed by site workforce.

  • All changes to onsite medical forms have been reported to the Avi Contracts Head Office.

  • Are all near misses reported to date?

Thermostat Readings

  • Have thermostat readings been recorded on this project?

  • Thermostat readings are all normal.

RAMS

  • Have all RAMS been updated inline with works that are being carried out?

  • Have all RAMS been signed and dated to updated copies by all workforce?

  • Have all questions, queries and concerns highlighted by the site team been reflected and amendments made to RAMS accordingly?

Tool Box Talks

  • All tool box talks have been completed and logged weekly

  • Tool box talks are variant every week and do not get repeated.

  • A copy of the tool box talk has been sent to the head office or a photograph taken at the time of audit to be logged on our internal system.

Staff Welfare

  • All if any reportable incidents that have happened onsite in the past two weeks have been recorded and noted by the site manager from the Avi Head Office and all problems dealt with?

  • Any questions if any from the workforce have been answered and resolved.

  • All new workforce have completed and returned the HR Starter Pack

Workmanship

  • All operatives are carrying out works to a good standard and inline with Avi Contracts best practice

  • All doors are being installed inline with correct regulations

General Comments

  • Any further comments or recommendations arising from this inspection?

  • Any positive feedback arising from this inspection?

  • Any major discrepancies arising from this inspection that need immediate corrective action?

  • Add any additional relevant photos

  • Have all required corrective actions been added as Actions to this inspection?

  • Please add any corrective actions to the appropriate questions above before completing this report

Sign Off

  • Name & Signature of Inspector

  • Name & Signature of Site Supervisor / Foreman

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.