Information
-
Project/ Site/Dept
-
Location
-
Conducted on
-
Inspection carried out by:
- Leigh Griffiths
- Laura Lee
- Graham May
- Steve Horton
- Nancy Holman
- Steven Ferrell
- Grant Wordsworth
- Thomas Enright
-
Reason for Inspection
- workplace inspection
- accident/incident
- change in legislation
- enforcement notice
- major construction
- near miss
- environmental reporting
- safety audit
- third party
-
Summary/Areas of concern/Good Practice.
1 Documentation and Administration
-
1.1 Priority reports from last inspection completed
-
1.2 SSOW (RA,RAMS) in place for work activities. Construction phase plan in place and up to date (if applicable)
-
1.3 Competent site manager appointed
-
1.4 Site inductions carried out
-
1.5 SLT minutes communicated/displayed
-
1.6 Statutory notices displayed ( HSE Law poster, policy ) F10 displayed (if applicable)
-
1.7 Permits to work issued and being controlled/ managed
-
1.8 Aspects & Impacts register in place
-
1.9 Asbestos register on site and displayed
-
1.10 Abstraction and discharge - Licence in place and are these being monitored/ controlled
-
1.11 other issues observed during inspection
2 Temporary works/ work at height
-
2.1 Ladders/stepladders and hop ups are in GWO
-
2.2 Scaffold/mobile towers erected correctly. Inspection ( carried out and up to date)
-
2.3 Roof/edge protection in place
-
2.4 is a competent temp work coord nominated
-
2.5 Are temp works designs available
-
2.6 other issues observed during inspection
3 Work equipment, PUWER & LOLER
-
3.1 Lift plan being followed and competent person on site ( if applicable)
-
3.2 Lifting equipment and pressure vessel appear in GWO and examination up to date.
-
3.3 Fixed wiring electrical in GWO, test certificate available and up to date
-
3.4 Portable tools & equipment in GWO and fit for purpose
-
3.5 Is appropriate guarding fitted and in GWO
-
3.6 Redundant plant ( fixed or mobile) managed
-
3.7 Other issues identified during inspection
4 Excavations
-
4.1 Are service drawing available and ground clearly marked
-
4.2 Excavations suitable shored/ supported. Deep excavations have design drawings/ information on site for shoring method
-
4.3 are suitable barriers/ edge protection in place and safe access/egress provided.
-
4.4 Are exposed service in good order and suitable supported
-
4.5 Other issues identified during inspections
5 Traffic management/ Street works
-
5.1 Traffic management plan In place ( if applicable) and up to date.
-
5.2 Site entrance not causing risk to the public
-
5.3 Pedestrian access/ egress suitable and segregated from vehicle/ plant movement
-
5.4 Road works/Chapter 8 to NRSW requirements being followed
-
5.5 Information boards/ permit No displayed
-
5.6 Spoil inside barriers/ run off controlled
-
5.7 Street works card held
-
5.8 other issues identified during inspection
6 Emergency Arrangments
-
6.1 Emergency plans/procedures in place and displayed. Fire escape routes clear from obstruction
-
6.2 First aid provision suitable and stocked. First aider notice displayed
-
6.3 Fire equipment/extinguishers in GWO. MaIntenance up to date
-
6.4 Other issues identified during inspection
7 Office/Site arrangements (including welfare)
-
7.1 Adequate welfare provision provided for numbers on site and in good order
-
7.2 Suitable means of heating/ preparing food - clean and in GWO
-
7.3 Are offices of adequate space and provided with good ventilation and lighting
-
7.4 Is housekeeping in good order throughout. No evidence of fly tipping on site
-
7.5 Any DSE issues
-
7.6 Buildings/ fixed assets appear in good order and no obvious signs of damage
-
7.7 If shelving/racking installed is it secure and appear in good order.
-
7.8 Do floors appear in good order and free from slips, trips
-
7.9 Other issues identified during inspection
8 Protection to/ from other ( including Environment)
-
8.1 Appropriate safety signage displayed
-
8.2 Hoarding/heras fencing in good order and secure
-
8.3 Fencing, gates and locks appear in good order. No signs of unauthorised access
-
8.4 Watercourses/ drainage plans marked and displayed. Are these suitable managed
-
8.5 Flora & Fauna - provision for biodiversity wildlife and habitats protected. Invasive species identified and managed
-
8.6 Environmental complaints - eg noise, dust, vibration
-
8.7 Other issues identified during inspection
9 Health, Manual Handling & PPE
-
9.1 Is appropriate PPE being worn and in good order
-
9.2 Are occupational health issues being controlled/ managed
-
9.3 Any Manual Handling Issues identified
-
9.4 Other issues identified during inspection
10 Hazardous Substenace
-
10.1 Hazardous substance being suitable stored including correct labelling.
-
10.2 Bunds in satisfactory condition. Drip trays if in use in good order
-
10.3 COSHH Assessments produced, available and up to date
-
10.4 Chemical/ fuel delivery areas in good order. Delivery procedure in place.
-
10.5 Are emergency showers/ eye wash in good order
-
10.6 Spill kit available and in good order. spill/emergency plan produced.
-
10.7 Other issues identified during inspection
11 Waste Management
-
11.1 Waste Management & duty of care documentation ip place and correct
-
11.2 Waste suitable stored, separated and labelled. Storage of materials as identified in SWMP
-
11.3 Are hazardous waste bins in place, correctly labeled and in an accessible location
-
11.4 Other issues identified during inspection
12 Other places of work and activities
-
12 Other places of work and activities
Observation:
-
<br>Other issues identified during inspection
SHE Priority report
-
Project/site/ dept
-
Select date
-
Present during inspection:
-
Priority Codes
P1 - Serious Imminent danger
P2 - Breach of legislation ACOP
P3 - Does not meet HSE or company policy or best practice
NA - Not applicable
Agreed Actions:
-
Priority Code:
-
Action owner
-
Agreed completion date:
-
Actions/ Recommendations
Report completed by:
-
Name:
-
Signed:
Reported accepted by:
-
Name:
-
Signed: