Pre-Erection checklist
-
1. Confirm Unit is not broke or damaged.
-
2.Glass Surface is free of imperfection coating
-
3.AlumInum framing and mullions are free of any damage or imperfections.
-
4.make sure vertical primary and secondary gasket conforms to the shop drawings.
-
5.Assure perimeter glass fin joinery and gasket conforms to the shop drawings.
-
6.Make sure inside horizontal stack joint gasket conforms to the shop drawings.
-
7.Make sure vertical/horizontal glass seal conforms to the shop drawings.
-
8.Make sure "accordion" horizontal gasket conforms to the shop drawings.
-
9.Confirm the units final location.
-
10.Crimp gasket raceway to ensure they won't displace during installation.
-
11. Clean all dirt,mud, water, and debris from unit being placed and those to which it is mating with.
-
12.sealant applied and tooled full length of unit prior to installation.
Problems and action(s) to be taken.
-
Please sign when you complete checklist.