Risk Matrix

  • Respond to the risks identified according to the risk matrix below

    Risk-Matrix-1024x550-800x430.png

Hazard: Lighting and audio creating confusion and lack of stability in environment

  • Risks: Physical Injury from reduced capacity of senses. Disorientation.

  • Initial Risk Rating

  • Controls implemented:

  • Operating technician to always notify others in the area of a change to current conditions unless in performance conditions that are being rehearsed/have been rehearsed. i.e “going to black” “set/truss moving (with location) “making noise” as is appropriate to activity that is being conducted.

  • Cues to be programmed and rehearsed prior to a performance, and all parties across who is in charge and what is happening

  • Movement around facility kept to a minimum unless it is part of the primary activity

  • Other: Create action details

  • Overall Risk Rating

Hazard: Lifting heavy or awkward loads, set construction

  • Risks: Manual handling injuries. Crush or collision

  • Initial Risk Rating

  • Controls Implemented:

  • Use of correct manual handling techniques

  • If lifting +20kg, 2 person lift

  • Movement around facility kept to a minimum unless it is part of the primary activity

  • Planning the lift and path of travel, ensuring pathways are clear, roles allocated and made clear

  • Where possible mechanical lifting aids to be used

  • Other: Create action details

  • Overall Risk Rating

Hazard: Trip Hazards

  • Risks: Sprains, strains, other injury or concussion

  • Initial Risk Rating

  • Implement Controls :

  • All personnel backstage inducted to area with potential known trip hazards identified

  • Pathways kept clear

  • Glow tape used on floor and within eye line to identify hazards in low level lighting conditions

  • Blue lights used backstage

  • Cables kept clear of high traffic areas- covered or taped down when not possible

  • Other: Create action details

  • Overall Risk Rating

Hazard: Lack of visibility

  • Risks: Damage to plant or equipment. Crush or collision. Trips or other injury, concussion

  • Initial Risk Rating

  • Implement Controls :

  • All personnel backstage inducted to area with potential hazards identified

  • Pathways kept clear

  • Glow tape used on floor and within eye line to identify hazards in low level lighting conditions

  • Blue lights used backstage

  • Cables kept clear of high traffic areas- covered or taped down when not possible

  • Other: Create action details

  • Overall Risk Rating

Hazard: Electricity

  • Risks: Faulty equipment causing damage to infrastructure. Faulty equipment causing electrocution. Burns

  • Initial Risk Rating

  • Implement Controls :

  • All electrical equipment tested and with current tag in accordance with AS3760

  • Visually inspect cables prior to each use for physical defects

  • Slack left at both ends and no pressure points

  • Cables kept away from high traffic areas or taped down/covered

  • Other: Create action details

  • Overall Risk Rating

Hazard: Noise

  • Risks: Damage to hearing. Misunderstanding of actions/instructions of other work.

  • Initial Risk Rating

  • Implement Controls :

  • Personnel warn others before making loud noises

  • Carry out work in isolate areas

  • Hearing protection

  • Personnel to reduce other high risk work during loud noise

  • Other: Create action details

  • Overall Risk Rating

Hazard: Working at Heights

  • Risks: Fall from heights causing injury. Objects falling from height.

  • Initial Risk Rating

  • Implement Controls :

  • Maintain 3 points of contact when at height

  • Assistance and ground support available

  • Remove any unnecessary tools and equipment when working at height

  • Adequate lighting to be provided

  • Other: Create action details

  • Overall Risk Rating

Hazard: Moving Vehicles (trucks, EWP)

  • Risks: Crush or collision. Damage to equipment.

  • Initial Risk Rating

  • Implement Controls :

  • Personnel to direct if required

  • Minimise number of people in and around area of work

  • Other: Create action details

  • Overall Risk Rating

Hazard: Fatigue

  • Risks: Fatigue related incident or injury whilst at work or travelling to or from work.

  • Initial Risk Rating

  • Implement Controls :

  • Mandatory 10hr breaks between shifts

  • Adequate breaks scheduled

  • Secondary employment declared

  • Other: Create action details

  • Overall Risk Rating

Hazard: Flown Technical Equipment

  • Risks: Objects falling from grid

  • Initial Risk Rating

  • Implement Controls :

  • Items to be hung as directed by manufacturer

  • Hook clamps and safety chains installed correctly and checked prior to flying out

  • Rigger to be engaged to ensure industrial fittings such as beam clamps, slings and motors for larger equipment are installed correctly and safely

  • Other: Create action details

  • Overall Risk Rating

  • Hazard: Other
  • List additional Hazard

  • Risks

  • Initial Risk Rating

  • Implement Controls

  • Overall Risk Rating

  • Acknowledgement and sign off
  • Staff Member or Contractor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.