Information
-
Location of Scaffolding
-
What bay?
-
Is this new or altered docking?
New or Altered Scaffolding Audit
-
1 - Can the Scaffolding be used to carry out it's intended job?
-
2 - Are there adequate handrails and fall protection measures in place?
-
3 - Are the steps attached correctly and locked with securing peg?
-
4 - Is there a requirement for edge protection on the scaffolding?
-
5 - Has the edge protection been fitted at this time
-
Agree date and time for protection to be fitted and cascade to Aircraft Controller or Planner.
Any other comments?
-
Any other comments?
-
Add media
Sign Off
-
Auditor's signature