Information

  • Document No.

  • Project Name - Location

  • Client / Site

  • Conducted on:

  • Prepared by:

  • Inspected by:

ICRA Risk Class: I. II. III. IV.

  • Class - I, II, III, or IV

Inspector:

  • Inspected by:

Post-Construction, Preoccupancy

  • Wet-mop area with disinfectant.

  • Barriers not removed until area thoroughly cleaned.

  • Barriers not removed until area inspected by Safety and Infection Control.

  • Renovation units thoroughly cleaned before admitting patients.

Utility Services

  • Water lines have been flushed thoroughly in newly renovated and adjacent areas before occupancy. This also applies to areas that have been vacant for a period of time and are being put back into service.

  • Provide documentation of correct procedures following re-establishment of interrupted utility services, including but not limited to:

  • Domestic water

  • Sewage system

  • HVAC System

  • Medical Gasses

Air Quality

  • If air ducts were not completely sealed, filters were removed & changed.

  • Remove isolation of HVAC system in areas where work is being performed.

Additional Comments and/or photos

  • Photos

  • Comments:

Signatures:

  • Development & Construction Rep:

  • Facilities Services Rep:

  • Safety Rep:

  • Infection Prevention Rep:

  • Contractor/Vendor Rep:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.