Information
-
Document No.
-
Project Name - Location
-
Client / Site
-
Conducted on:
-
Prepared by:
-
Inspected by:
ICRA Risk Class: I. II. III. IV.
-
Class - I, II, III, or IV
Inspector:
-
Inspected by:
Post-Construction, Preoccupancy
-
Wet-mop area with disinfectant.
-
Barriers not removed until area thoroughly cleaned.
-
Barriers not removed until area inspected by Safety and Infection Control.
-
Renovation units thoroughly cleaned before admitting patients.
Utility Services
-
Water lines have been flushed thoroughly in newly renovated and adjacent areas before occupancy. This also applies to areas that have been vacant for a period of time and are being put back into service.
-
Provide documentation of correct procedures following re-establishment of interrupted utility services, including but not limited to:
-
Domestic water
-
Sewage system
-
HVAC System
-
Medical Gasses
Air Quality
-
If air ducts were not completely sealed, filters were removed & changed.
-
Remove isolation of HVAC system in areas where work is being performed.
Additional Comments and/or photos
-
Photos
-
Comments:
Signatures:
-
Development & Construction Rep:
-
Facilities Services Rep:
-
Safety Rep:
-
Infection Prevention Rep:
-
Contractor/Vendor Rep: