Title Page

  • Conducted on

  • Prepared by

  • Location
  • Attendees

Site details

  • Brief description of the site location.

  • Are there residents within close proximity of the branch?

  • Is the building Listed

  • Will a Pre-planning application be required

  • Level access/DDA compliant

  • As-built drawings accurate

  • Pavement Licence or hoarding required

  • Photo of Parking areas

  • Photo of Parking Signage

  • Photo of Other External Items

H&S

  • Surrounding Area /Adjacent Land Usage

  • Existing Site Usage

  • Existing Structure/Stability

  • Vehicle Access Restrictions

  • Material Delivery Considerations

  • Material Storage Constraints

  • Waste Storage & Movement Issues

  • Live environment working

  • Site Office/Welfare Issues

  • Working at height issues

  • Hazards Potentially applicable to site

  • Any other H&S to note

Security

  • Is secondary access achievable to the proposed office space

  • Does the comms room have a lockable door

  • Does the bank hold a TRACKA key box that could hold the keys to the comms room

  • Will the First Entry Routine be affected by the Proposed works.

  • 100MB Hard upgrade required to branch to support CCTV & VPN

  • New external doors required for secondary access

  • New Internal Doors Required For Secondary Access

  • New CCTV

  • New Intruder Alarms

  • New pass doors

  • Access control required

  • New window bars required

  • New secure line

  • Comms room dimensions

  • Any other security elements to note

  • Photos of existing security equipment

  • Photo of Comms Room

  • Photo of secondary access

  • Photo of ADT Items in general

MEP

  • Is there existing Mechanical Ventilation to the proposed Office Space

  • Is there existing Air Conditioning to the proposed Office Space

  • Is there existing Lighting and Power to the proposed Office Space

  • Condition of the existing AC & External plant that serves the proposed area

  • Condition of lighting to Proposed Office Space

  • Power distribution to new desks via???

  • Is there plumbing works required due to new staff facilities, kitchens, WCs, etc

  • Is a new zip tap required

  • Is the external plant easily accessible?

  • Any vertical transportation works required

  • Where is the external plant located

  • Photos of external Plant Areas

  • Photos of internal AC units

  • Photos of Lighting

  • Photos of FA panel

  • Photo of DB Boards

DATA & AV

  • Data cabling required to all new desk positions

  • New WIFI Data Access Points to be supplied and installed

  • Data Cabling required for new CCTV Cameras and Access control

  • Any new TVs required?

  • Will Video Conference be required

  • New Staffroom TV required

  • New TV Aerials required

  • Any other AV to note

  • Photos of any AV items that may be applicable

  • Photos of Comms Cabinet

  • Photos Inside Comms Cabinet

  • New Access Points to be supplied

  • New Access Points required for TV location

  • Data points required to BOH desks

  • New IT to be supplied by GTIS

  • Existing IT to be removed and stored off-site by GTIS

  • Printers onsite that can be re-used

  • Any other Data/IT to note

  • Existing Comms Rack location Marked on drawings

  • Photos of Existing Data & IT

Specialist items required

  • Asbestos R&D survey

  • MEP Intrusive survey

  • Structural intrusive survey

  • F&G building survey

  • Acoustic survey

  • Drainage survey

  • Full building Dims survey

  • Party wall

  • Building Control

  • Thermographic & airtightness

  • Roof survey

  • New FRA (Fire risk assessment) required

  • New WBRA (Whole building risk assessment) required

  • New WRA (Water risk assessment) required

  • Other

General Notes

  • Windows condition

  • Walls to be demolished

  • Walls to be built

  • New carpets

  • New suspended ceiling

  • New kitchenette

  • Existing Ceiling Type

  • Type of existing floors

  • Openable windows within proposed space

  • Are lockers required- 2no per new desk

  • Are filing cabinets required minimum 4no

  • Are new pedestals required

  • Are new blinds required

  • Dimensions in general taken to Proposed Office Space - Add to drawings

  • Internal Door Dimensions added to drawings

  • Ceiling Heights added to drawings

  • Existing Entrance Door Dimensions added to drawings

  • Photos of Access routes to floor

  • Photos General

  • Window dims taken if applicable

Existing Furniture

  • Chairs to be retained/reused

  • Desks/Tables to be retained/reused

  • Tambor units to be retained/reused

Outputs following ISV

  • MEP Building evaluation report

  • MEP Outline scheme proposals

  • MEP Risk register

  • MEP revised budget cost report

  • Data revised budget cost report

  • Security updated costs and designs

  • Structural Engineers - Structural report

  • ISG design - updated Redline drawings

  • ISG design - OSD pack

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.