Site details
-
Brief description of the site location.
-
Are there residents within close proximity of the branch?
- Above building
- Side of building
- Rear of building
- No Residents
-
Is the building Listed
-
Will a Pre-planning application be required
-
Level access/DDA compliant
-
As-built drawings accurate
-
Pavement Licence or hoarding required
-
Photo of Parking areas
-
Photo of Parking Signage
-
Photo of Other External Items
H&S
-
Surrounding Area /Adjacent Land Usage
-
Existing Site Usage
- Retail Bank
- Empty Premises
- Other
-
Existing Structure/Stability
-
Vehicle Access Restrictions
-
Material Delivery Considerations
-
Material Storage Constraints
-
Waste Storage & Movement Issues
-
Live environment working
-
Site Office/Welfare Issues
-
Working at height issues
-
Hazards Potentially applicable to site
-
Any other H&S to note
Security
-
Is secondary access achievable to the proposed office space
-
Does the comms room have a lockable door
-
Does the bank hold a TRACKA key box that could hold the keys to the comms room
-
Will the First Entry Routine be affected by the Proposed works.
-
100MB Hard upgrade required to branch to support CCTV & VPN
-
New external doors required for secondary access
-
New Internal Doors Required For Secondary Access
-
New CCTV
-
New Intruder Alarms
-
New pass doors
-
Access control required
-
New window bars required
-
New secure line
-
Comms room dimensions
-
Any other security elements to note
-
Photos of existing security equipment
-
Photo of Comms Room
-
Photo of secondary access
-
Photo of ADT Items in general
MEP
-
Is there existing Mechanical Ventilation to the proposed Office Space
- Yes
- No
- In some areas new to be considered
-
Is there existing Air Conditioning to the proposed Office Space
- Yes
- No
- In some areas new to be considered
-
Is there existing Lighting and Power to the proposed Office Space
- Yes
- No
- In some areas new to be considered
-
Condition of the existing AC & External plant that serves the proposed area
-
Condition of lighting to Proposed Office Space
-
Power distribution to new desks via???
- Wall mounted DADO trunking
- Floor Box
- Mixture of Dado rail & Floor Box's
-
Is there plumbing works required due to new staff facilities, kitchens, WCs, etc
-
Is a new zip tap required
-
Is the external plant easily accessible?
-
Any vertical transportation works required
-
Where is the external plant located
-
Photos of external Plant Areas
-
Photos of internal AC units
-
Photos of Lighting
-
Photos of FA panel
-
Photo of DB Boards
DATA & AV
-
Data cabling required to all new desk positions
-
New WIFI Data Access Points to be supplied and installed
-
Data Cabling required for new CCTV Cameras and Access control
-
Any new TVs required?
-
Will Video Conference be required
-
New Staffroom TV required
-
New TV Aerials required
-
Any other AV to note
-
Photos of any AV items that may be applicable
-
Photos of Comms Cabinet
-
Photos Inside Comms Cabinet
-
New Access Points to be supplied
-
New Access Points required for TV location
-
Data points required to BOH desks
-
New IT to be supplied by GTIS
-
Existing IT to be removed and stored off-site by GTIS
-
Printers onsite that can be re-used
-
Any other Data/IT to note
-
Existing Comms Rack location Marked on drawings
-
Photos of Existing Data & IT
Specialist items required
-
Asbestos R&D survey
-
MEP Intrusive survey
-
Structural intrusive survey
-
F&G building survey
-
Acoustic survey
-
Drainage survey
-
Full building Dims survey
-
Party wall
-
Building Control
-
Thermographic & airtightness
-
Roof survey
-
New FRA (Fire risk assessment) required
-
New WBRA (Whole building risk assessment) required
-
New WRA (Water risk assessment) required
-
Other
General Notes
-
Windows condition
-
Walls to be demolished
-
Walls to be built
-
New carpets
-
New suspended ceiling
-
New kitchenette
-
Existing Ceiling Type
-
Type of existing floors
-
Openable windows within proposed space
-
Are lockers required- 2no per new desk
-
Are filing cabinets required minimum 4no
-
Are new pedestals required
-
Are new blinds required
-
Dimensions in general taken to Proposed Office Space - Add to drawings
-
Internal Door Dimensions added to drawings
-
Ceiling Heights added to drawings
-
Existing Entrance Door Dimensions added to drawings
-
Photos of Access routes to floor
-
Photos General
-
Window dims taken if applicable
Existing Furniture
-
Chairs to be retained/reused
-
Desks/Tables to be retained/reused
-
Tambor units to be retained/reused
Outputs following ISV
-
MEP Building evaluation report
-
MEP Outline scheme proposals
-
MEP Risk register
-
MEP revised budget cost report
-
Data revised budget cost report
-
Security updated costs and designs
-
Structural Engineers - Structural report
-
ISG design - updated Redline drawings
-
ISG design - OSD pack