Title Page
-
Site conducted
-
Quality Control Check Name
-
Conducted on
-
Account used
-
Elevations
-
Elevation
-
Floor Level
- Level 01
- Level 02
- Level 03
- Level 4
- Level 5
- Level 6
- Level 7
- Level 8
- level 9
- level 10
- level 11
-
Section(s)
- Section 1
- Section 2
- Section 3
- Section 4
- Section 5
- Section 6
- Section 7
- Section 8
- Section 9
- Section 10
Horizontal zed Rail
-
Are the helping hand brackets installed correct with isolation packer?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Are the correct anchor fixings being used for helping hand brackets
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Are the brackets fixed at the correct centres ?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.
Vertical Rails
-
Have the vertical been fixed with the correct fixed points and sliding points?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Have the correct fixing been used to fix the rails to brackets
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.
Cavity Barriers / Siderise RHG25 & RV25
-
Have the vertical barrier brackets been fixed with correct spacings? 2 per unit at 600mm spacings. note 300mm in from each end
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Have the horizontal barrier brackets been fixed with correct spacings? 3no per cut length at 400mm spacings? •
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Are the barriers tightly abutted?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Horizontal barrier - is the required air gap of 25 mm correct?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Do all vertical barriers take precedence over horizontal barriers?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Is the vertical barrier depth correct to allow for 10mm compression?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Has the fire rated sealant been applied to any gaps at rear of barriers if required ?
-
Has foil tape been applied at joints between vertical and horizontal barriers ?
-
HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.
Insulation / Duoslab
-
Has the insulation been fixed correctly with 1 metal fixing & two polypropylene plates per board?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
Is the insulation installed tightly / are any gaps filled?
-
Please describe the nature of the issue
-
Has this now been rectified and reinspected?
-
Please describe what actions were carried out to rectify the issue
-
HOLD POINT - AFTER all of this element's works are fully complete and acceptable for this entire scaffold level / Elevation, take photos showing the element as a whole. Do not continue with works or this form until done.
Completion
-
Are there any other notes relevant to this particular Elevation/Scaffold Level not covered by the previous questions?
-
Are there any other photos relevant to this particular Elevation/Scaffold Level not covered by the previous questions?
-
Sign below to confirm that questions above have been answered truthfully and with all relevant due diligence having been carried out. Please include the person's name.
-
Russell Roofing Signature