Title Page & Entry
FACILITY ENTRY & FIRST IMPRESSION
-
Date Of Inspection Or Visit
-
While Driving Up / Driving Around / Or Entering The Facility, Was There Anything That Caught Your Attention To Report ( Trash, Safety Concerns , Lights Out etc etc )
-
Are You Satisfied With Your Initial First Impressions Of The Facility ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Life Safety Drawing
LIFE SAFETY DRAWING, YEAR BUILT ETC
-
Life Safety Drawings Present ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Year Built
-
How Many Smoke Compartments ?
-
Base On Review Of Documentation, Does Documentation's Meet Compliance
- Compliant
- Yes
- Non Compliant
- No
- N/A
Fire Alarm Inspection (Annual)
FIRE ALARM ANNUAL INSPECTIONS
-
Fire Alarm Company Name
-
Fire Alarm Annual Date
-
Any Discrepancy Found Or Is It In Compliance?….. (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was The Annual Fire Alarm Inspection Discrepancies Corrected And Now In Compliance ?
-
When Was It Corrected ?
Device Testing
ALARM DEVICE TESTING
-
Verify Proper Location Of Smoke , Heat , Strobes And (CO) Detectors
-
Are Tamper Switches Being Tested ?
-
Pull Station Inspected Or Tested ?
-
Required Documentation Located At The Fire Panel ?
-
Fire Inspections ( Current At Least Through Past 2 Years )
Pressure Differential Testing
DUCT DETECTOR PRESSURE DIFFERENTIAL ANNUAL TESTING
-
Company Name
-
Annual Pressure Differential Testing Date
-
Duct Detectors Pressure Differential ( Shall Include Factory Parameters And Actual Test Reading), Was This Observed ?
-
Any Discrepancy Found Or Is It In Compliance?
2 Year Sensitivity Testing
SENSITIVITY TESTING
-
Company Name
-
Sensitivity Testing Date
-
Smoke Sensitivity ( Shall Include Factory Parameters And Actual Test Reading ) , Was This Observed ?
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Fire Alarm Inspection (Semi-Annual)
FIRE ALARM SEMI-ANNUAL
-
Company Name
-
Fire Alarm Semi-Annual Date
-
Any Discrepancy Found Or Is It In Compliance?…. (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Corrected ?
Sprinkler Annual Inspections
ANNUAL SPRINKLER INSPECTION
-
Sprinkler Company Name
-
Sprinkler Annual Date
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Fire Inspections ( Current At Least Through Past 2 Years )
Miscellaneous Inspections # 1
MISCELLANEOUS INSPECTIONS # 1
-
Proper amount of Sprinkler Heads Located in spare box with correct wrench: Y/N ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
List of Sprinkler type(s) installed in spare Sprinkler cabinet: Y/ N ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Revision Date: Listed For Sprinklers In Sprinkler Box ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Annual Back Flow
ANNUAL BACKFLOW
-
Company Name
-
Annual Back Flow Date
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Sprinkler Semi - Annual Inspection ( Semi-Annual )
SPRINKLER SEMI - ANNUAL
-
Company Name
-
Sprinkler Semi-Annual Date
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Quarterly Sprinkler Inspection # 1
QUARTERLY SPRINKLER #1
-
Company Name
-
Quarterly Sprinkler # 1 Date
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Quarterly Sprinkler Inspection # 2
QUARTERLY SPRINKLER # 2
-
Company Name
-
Quarterly Sprinkler #2 Date
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
5 Year HYDROSTATIC Sprinkler FDC ( Fire Department Connection)
5 YEAR HYDROSTATIC/ FDC INSPECTION
-
Company Name
-
5yr Hydrostatic FDC Inspection Date
-
FDC Hydrostatic ( Fire Department Connection ) Tested At 150 Psi For Two Hours And Documented On Inspection Report ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
5 Year Internal BackFlow
5 YEAR INTERNAL BACKFLOW
-
Company Name
-
5 Year Internal BackFlow Date
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was It Corrected ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Miscellaneous Inspections #2
MISCELLANEOUS INSPECTIONS #2
-
Annual Dry Partial Trip:
-
Pre-Action Systems:
-
Type:
-
Date:
-
Isolation Valves: Y/N
-
Reported Discrepancy(s): Y/N
Fire Pump
-
Diesel: Electric: Weekly: Monthly:
-
Company:
-
Annual Date
Water Storage
-
Comapny
-
Annual Date
-
3 Year / 5 Year Internal
Fire Hydrant
FIRE HYDRANT INSPECTION
-
Public Or Private Hydrant
-
Annual Done ? ( Answer YES Or NO Only If It’s A Private Hydrant ), ( If It’s A Public Hydrant Please Select N/A)
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Done ?
-
5 Year Hydrant Inspection Including Flow Test / Pressure Testing Done ? (Answer YES Or NO Only If It’s A Private Hydrant ), ( If It’s A Public Hydrant Please Select N/A)
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Done ?
Hood Inspection
HOOD INSPECTION
-
Company Name
-
Semi Annual Being Done Or In Compliance Within The Last 12 Months ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Done ?
-
Annual Being Done Or In Compliance Within The Last 12 Months ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Done ?
Monthly Kitchen Quick Hood Check
-
Monthly Hood Check Been Done ? ( Kitchen Quick Check )
- Compliant
- Yes
- Non Compliant
- No
- N/A
Hood Cleaning
HOOD CLEANING
-
Company
-
Semi Annual Was Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Done ?
-
Annual Was Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Done ?
Smoking Regulations Quick Check
SMOKING REGULATION QUICK CHECK
-
Smoke-Free Building ?
-
Smoking Policies Available ? ( A Smoking Policy Is Needed Regardless If It’s A Smoke Free Facility Or Not )
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Meets NFPA 101
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Smoking Area Available ? ( If It’s A Smoke Free Building Then Click N/A )
-
Ashtrays On Site ( Compliant / Non-Compliant ) ( ( If It’s A Smoke Free Building Then Click N/A )
-
Permitted Ashtrays ( Are They The Correct Ashtrays As Required By Code ) ? . ( ( If It’s A Smoke Free Building Then Click N/A )
-
Self Closing Metal Can ? . ( ( If It’s A Smoke Free Building Then Click N/A )
-
Smoking Aprons Available ?. ( ( If It’s A Smoke Free Building Then Click N/A )
-
Smoking Blankets Available . ( ( If It’s A Smoke Free Building Then Click N/A )
-
Smoking Blankets Refolded Annually ? . ( ( If It’s A Smoke Free Building Then Click N/A )
Fire Extinguisher
FIRE EXTIGUISHER
-
Comapany
-
Annual Date ?
-
Any Discrepancy Found Or Is It In Compliance?… (Please note : If at the time of visit , Discrepancies were Found but proof of corrections were found and made then Compliant will be selected with comments made in the note section )
-
Was Corrections Done To Bring Report Back Into Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Fire Damper
FIRE DAMPER INSPECTION ( 4 YEARS FOR NURSING HOMES , 6 YEARS FOR HOSPITALS )
-
Company
-
Was This Done ( Links: Y/N (6yr Hospital, 4yr ALL others):
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was This Done ?
Generator
GENERATOR INSPECTION, ANNUAL, LOAD BANK, FEUL TESTING, WEEKLY , MONTHLY ETC
-
Company
-
How Many Generator Are On Site
-
Generator (s) Spec ( KW)
-
Generator (s) Specs ( Fuel Gallon Capacity )
-
Transfer Switch Automatic: Y /N
-
Manual: Y/N
-
If Manual is someone trained onsite: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Is Annual Generator Testing Been Done And In Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was This Done
-
Type Of Fuel
-
Fuel Analysis Done And In Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was This Done ?
-
Load Bank Done And In Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was This Done
-
Annual Main Breaker Exercise Been Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
WEEKLY AND MONTHLY TESTING
-
Weekly Inspections Been Done And In Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Monthly Inspection Been Done Under At Least 30 % Load ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Conductance Testing Been Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Weekly Voltage Been Checked ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
GENERATOR OPERATION IN-SERVICE / EDUCATION AND QUESTIONS
-
Can Maintenance Director Demonstrate How Operate Generator In The Event Of An Emergency ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Is Annual In-Service Been Done To Show And Demonstrate To Key Personnel How To Properly Operate The Generator ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
In-service Present ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
If there’s An Optional Standby Generator On Site , Is Maintenance and Testing per Manufacture Recommendations or NFPA 110 Been Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Generator Manual Located On Site ? (At Least 2 Manuals)
-
Does Generator Powers Entire Facility ?
- Yes
- No
- N/A
-
Cool Zone Plan For Facility ( For Facility Without Full House Generator ) Present And In Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
GENERATOR HIGH MORTALITY PARTS
-
High Mortality Parts (NFPA 110 8.2.4) . NFPA 110 8.2.4 focuses on emergency power supply system (EPSS) maintenance and testing. It specifically requires that high-mortality parts, which are components with a higher likelihood of failure, be identified and either provided in a parts inventory or a plan be in place for their prompt replacement. This ensures that emergency power systems remain reliable and functional in critical situations. Examples of high-mortality parts in a generator, as mentioned in NFPA 110, could include components like fuel filters, belts, hoses, and batteries. These parts are subject to wear and tear or have a limited lifespan, making them more likely to fail over time. Regular inspection and replacement of these parts are crucial for ensuring the reliability of the generator system. Does Facility Have These Spare Parts On Site And Are In Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Where Is It Located ?
Main Feeder Breaker ESS
MAIN FEEDER BREAKER ESS ( ANNUAL )
-
Company Name
-
When Was It Done ? (Annual)
-
Base On Review Of Documentation, Does Documentation's Meet Compliance
HVAC, PTAC & MECHANICAL
HVAC, PTAC , MECHANICAL EQUIPMENT
-
- Mechanical Equipment HVAC: Inspected / Maintained And Being Cleaned : Y/N
-
Maintenance Of Critical Equipment Being Done : Y/N
-
Duct Cleaned: Y/ N
-
Area Clear of Obstructions: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Panel Labels Correct: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
Battery Emergency Lights
BATTERY EMERGENCY LIGHTS TESTING
-
Company / In-house ?
-
Was Annual Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was This Done ?
-
Are Monthly Been Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Receptacles
RECEPTACLE INSPECTION
-
Company / In house ?
-
Is The Annual Being Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Done ?
Bio Medical Equipment Inspection
BIO-MEDICAL
-
Company Name
-
Is The Annual Been Done ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When Was It Done ?
L.I.M
LINE . ISOLATION . MONITOR TESTING
Is a procedure to check the functionality of a device called a Line Isolation Monitor, primarily used in healthcare facilities to monitor for electrical faults within isolated power systems, ensuring patient safety by detecting potential leakage currents to ground. Key points about L.I.M testing: PURPOSE: To identify potential electrical faults in isolated power systems, commonly found in operating rooms and critical care areas within hospitals. WHAT IT MEASURES : The Line Isolation Monitor continuously monitors the current balance between the lines of an ungrounded electrical system, alerting if there is an imbalance indicating a fault. TESTING FREQUENCY : Typically conducted annually as per healthcare facility codes and standards like NFPA 99.
-
Company / InHouse
-
Monthly: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Annual: datetime
-
O.R. Risk Assessment: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Base On Review Of Documentation, Does Documentation's Meet Compliance
- Compliant
- Yes
- Non Compliant
- No
- N/A
Med Gas Piped
MED GAS PIPED INSPECTION
-
Company
-
Annual: datetime
-
Reported Discrepancy(s): Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Repaired: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Base On Review Of Documentation, Does Documentation's Meet Compliance
- Compliant
- Yes
- Non Compliant
- No
- N/A
Med Gas Equipment
-
Qualifications and Training of Personnel: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
Oxygen And Oxygen Storage
OXYGEN AND OXYGEN STORAGE
-
Proper signage/labels: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Five feet from combustibles: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
- Storage racks: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Does Portable Holders Have Locks / Are Tanks Secured ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Does Facility Have Oxygen Threshold Policy ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Boilers
BOILERS
-
Boiler(s) - Company:
-
Boiler(s) - Date:
-
Boiler(s) - Annual / Biennial Jurisdiction #
-
Base On Review Of Documentation, Does Documentation's Meet Compliance
- Compliant
- Yes
- Non Compliant
- No
- N/A
Fire / Smoke Doors NFPA-80
NFPA 80 / FIRE / SMOKE / ATTIC DOORS
-
Fire Doors - Company / In-house:
-
Annual Fire Door Inspection Been Done And In Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Fire Doors - Any Discrepancy(s) Found ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Was Corrections Made ? Back In Compliance ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Fire Doors - Repaired: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
ATTIC DOORS
-
Attic - Rated Access Doors: Y/ N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Attic - Inspected/Maintained: Y / N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Attic - Sprinkled: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Attic - Hazards: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Attic - Insulated: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
SMOKE DOORS
-
Smoke Doors - In-House Inspection and Maintenance: ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Smoke Doors - Issues: ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
Elevator
ELEVATOR INSPECTION
-
Elevator - Maintenance: Company
-
Elevator - Inspection: Date
-
Elevator - Recall Key Per NFPA 1: Y/N
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Elevator Certificate Up - To - Date ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
When was it renewed or when does it expire ?
Patient Room Observation Tour
PATIENT ROOM AND QUICK OBSERVATION TOUR
-
Patient Rooms - Windows sill height:
-
Patient Rooms - Room size:
-
Patient Rooms - Nurse call/controller: Y/N
-
Patient Rooms - Oxygen Compliant: Y/N
-
Patient Rooms - Emergency/electrical receptacle count:
-
Patient Rooms - Bathroom nurse call: Y/N
-
Patient Rooms - Closet/Wardrobe, Closet Sprinkled: Y/N
-
Patient Rooms - Trash can size:
-
Patient Rooms - Bath Exhaust working: Y/N And In Compliance ?
-
Patient Rooms - Tripping hazards: Y/N
-
Patient Rooms - Hazardous Storage areas: Door Closers: Y/N Square Footage:
-
Patient Rooms - Sprinkler Coverage: Y/ N
-
Patient Rooms - Rated Wall: Y/N
-
Patient Rooms - ABHR in Storage:
-
Patient Rooms - gal/fl (640fl = 5gal max per smoke compartment) Condition Met: Y/N
-
Patient Rooms - Ceiling Tiles & Ceiling Assemblies (per NFPA 1 - 13.3.3.3): Y/N
CEMP
COMPREHENSIVE EMERGENCY MANAGEMENT PLAN (CEMP)
-
CEMP - County:
-
CEMP - Date Submitted:
-
CEMP - Date Approved:
-
Was It Approved Before The Expired Date Of The Previous Approval Letter/Plan ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
CEMP - CEMP Emergency Environmental Control Plan 59A-4.1265, Review Plan of Cool Areas. ( Plan Reviewed And Meet Compliance)
-
CEMP - Receiving Residents from other Facility: Y/ N ?
-
( If so, How Many) Number of additional Residents ?
Fire Plan / Fire Action Plan
FIRE PLAN / ACTION PLAN
-
Fire Plan - Department:
-
Fire Plan - Date Approved:
-
Fire Plan - Review Fire Plan Components for Compliance: Y/N (See Requirements NFPA 101 (2012 For CMS - 19.7.2.2)
- Compliant
- Yes
- Non Compliant
- No
- N/A
Disaster Drills
DISASTER DRILLS
INTERNAL DRILL
-
Disaster Drills - Type # 1 (Internal)
-
Disaster Drills - Date:
-
100 % In- Service ( All Staff )
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Disaster Drills - (Synopsis / Critique Or Evaluation Completed: Y/N
EXTERNAL DRILL
-
Disaster Drills - Type #2 ( External)
-
Disaster Drills - Date:
-
100 % In- Service ( All Staff )
-
Disaster Drills - (Synopsis / Critique Or Evaluation Completed: Y/N
Disaster Drills FeedBack
-
Are You Happy Or Satisfied With The Disaster Drills ? ( example: scenarios, randomness of drill, drill types, drill critique etc )
-
What Were Your Concerns ? And Or What Needs To Be Done ?
-
In Your Overall Assessment Of The Fire Drills And Standard That Is Required By AHCA, CMS And Others, Do You Find These Disaster Drills In Compliance ?
Fire Drill
FIRE DRILLS
JANUARY DRILL
-
SHIFT
-
DRILL CONDUCTED ?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
FEBRUARY DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
MARCH DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
APRIL DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
MAY DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
JUNE DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
JULY DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
AUGUST DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
SEPTEMBER DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
OCTOBER DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
NOVEMBER DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
DECEMBER DRILL
-
SHIFT
-
DRILL CONDUCTED?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
TIME OF DRILL
-
(DAYS) AND (TIMES) OF CORRESPONDING SHIFT…
Fire Drill Feed Back
-
Are You Happy Or Satisfied With The Drills ? ( example: scenarios, randomness of drill, drill critique, drills been done at least a hour apart from the last corresponding shift ( ( this is to ensure that each corresponding shifts are at least at a one hour gaps from each other… For Example, if the 1st shift was done at 7:20am then the next 1st shift should be at a minimum either a hour before or a hour after the last 1st shift drill etc. So if the 1st shit was 7:20am then the next first shift should be at minimum 8:20am since 8:20am is at least an hour before 7:20am or it can be at least 6:20am since that’s also a hour minimum apart)
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
What Were Your Concerns ? And Or What Needs To Be Done ?
SVA ( Security Vulnerability Assessment)
SECURITY VULNERABILITY ASSESSMENT (SVA)
-
SVA ( Security Vulnerability Assessment) Review And Update And Done Up To Compliance?
- Compliant
- Yes
- Non Compliant
- No
- N/A
-
Drills are been done for vulnerabilities identified within the last 12 months and are they in compliance
- Compliant
- Yes
- Non Compliant
- No
- N/A
Nurse Call System Testing
NURSE CALL SYSTEM
-
Tested Random Room Nurse Call System
-
Nurse Call Over The Light Dome Worked ?
-
System Communication Worked At The Nursing Station ?
Others
ANY CONSTRUCTION AND OFFICE OF PLANS AND CONSTRUCTIONS (OPC)
OTHER COMPLIANCE
-
Any Major Construction/Renovations Happening?
-
OPC Project #
INFECTION CONTROL RISK ASSESSMENT ( ICRA )
-
ICRA ( If ICRA Is Not Required Then Click N/A )
LOCKING ARRANGEMENTS AND DOOR SIGNAGE
-
Special locking arrangements
-
Door Signage
OTHER #2
-
Soiled Linen and Trash Containers: Proper location
-
Roof/Exterior of Building: Over hangs
- Good
- Fair
- Poor
- N/A
-
Vegetation Growing in Gutters
-
Exit discharge to public way (hard packed all-weather surface)
-
Lighting to Public Way
-
Walls: Check Finish and coverings
-
List any issues such as Paint, Rotten Wood, Water Damage, Garbage, Broken Windows, Roof Condition, HVAC Unit/s Condition, Rodent Control
Water Temp Checks
WATER TEMPERATURE
-
Are Temperature In Rooms Being Checked
-
What Are The Random Rooms That You Checked And What Were The Temp Readings
-
Are The Temps In Line With Policy 104 - 110 Degress
- Compliant
- Yes
- Non Compliant
- No
- N/A
Comments , Observations , Concerns Etc
COMMENTS, OBSERVATIONS , ASSESSMENTS, CONCERNS ETC
-
During going through documentations , walking the facility , speaking with ED , Maintenance, or Any Staff , is there anything that stand out that you believed needed addressing , work or any concerns that wasn’t addressed in the questionnaire
-
What’s the comments you want to add