Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Inductions
-
SWMS; Safety Plan; Site Safety Rules; Pre Start/Tool box Talk; other
-
SWMS; Safety Plan; Site Safety Rules; Pre Start/Tool box Talk; other
-
SWMS; Safety Plan; Site Safety Rules; Pre Start/Tool box Talk; other
-
Project management Safety Plan Documents completed correctly and up to date
-
Bass induction up to date
-
Client Specific inductions completed
-
Have Sub Contractors completed all inductions
Plant and Equipment
-
Have electrical and plant equipment inspections been completed
Working at Heights
-
Height safety equipment being used and has it been inspected
-
If working at heights are they trained and using the equipment as per their training
-
Is there rescue equipment available and are their trained personnel close and has a rescue plan been documented
-
Safety Line Rope grab preliminary set up
Site specific
-
Have all isolations been undertaken as per SOP and SWMS
-
Is housekeeping satisfactory
-
Are EWP being used and have the had a preoperational check and are the operators qualified
-
Are fist aid kits available
-
Are fire extinguishers available
-
Have hazardous manual handling tasks been evaluated on the manual handling risk assessment form
-
Are suitable barricades, warning signs erected, pedestrian and traffic management movements considered with controls in place
-
Rough sketch of traffic/pedestrian set up
-
Is the light available for task or is extra lighting required
-
Is all required PPE for the task being utilised appropriately or is there extra PPE required
-
Are ladders and scaffolding fir for task and being used in accordance with SWMs and COP
-
Emergency assembly point identified
-
Is there adequate supervision on site both sub contractors and Bass employees
-
Safety folder/notice board on site and up to date
-
SDS available, current and substances stored appropriately
-
All permits required and are they relevant to the work being undertaken
-
Are there suitable means of communication available,
-
Have consultation arrangements been implemented for all. Employees, labour hire and sub contractors on site and have the outcomes been recorded
SWMS and Permits
-
Dial before you dig required and is it current
-
Are all relevant permits obtained for the work activity being undertaken
-
Do the sub contractors have a SWMS and are they complying with this SWMS
-
Does Bass employees have a SWMS and are they complying with the SWMS
-
Are there any environmental hazards and have they been addressed
-
Persons spoken to on site
-
Comments
-
Areas of improvement/corrective action
-
Signature of supervisior
-
Signature of WHS Co-ordinator