Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Date and Time of Inspection

Site Organisation & Planning Satisfactory

  • Site Safety File available?

  • Where necessary have risk assessments been carried out for individual work tasks?

  • Are Risk Assessments kept in the file?

  • Are Method Statements kept in the file?

  • Have the RAMS acceptance forms been completed in the site safety file?

  • Are there competent supervisors on site?

  • Is the supervisor carrying out an induction with all Baudelaire operatives?

  • Has the site induction attendance sheet been filled in?

  • Are operatives in possession of clear and proper instructions?

  • If required, has the Asbestos register been consulted?

  • Are operatives signing in on the Baudelaire site attendance form?

  • Have the site emergency procedures been relayed to all staff during induction?

  • Is there evidence that H & S is monitored and action taken place to put right poor performance?

  • Is the Principal Contractor co-ordinating H & S with Baudelaire Ltd?

  • Is there evidence in the file for staff training?

  • Have toolbox talks been carried out?

  • Have toolbox talks been recorded in the file?

  • Have the site rules been explained to all operatives?

  • Is there evidence of site operatives being asked for their views on Health and Safety?

  • Is there an accident book in the site safety file?

  • Are there clear management structures on site?

Protection of Site Users & The Public

  • Are barriers used to enclose the work area?

  • Are materials stacked left safe?

  • Are dangerous substance securely stored?

  • Are all vehicles accessing site safely?

  • Are all deliveries occurring during prescribed times?

  • Is Safety signage adequate?

Welfare Facilities

  • Are washing facilities provided?

  • Is drinking water provided?

  • Are toilet facilities adequate and clean?

  • Are suitably heated rest/eating facilities adequate?

  • Are clothing drying, storage and changing facilities provided and adequate?

  • Is First Aid provision adequate?

Site Wide Issues

  • Is the site being kept tidy by Baudelaire operatives?

  • Suitable storage of waste provided on site?

  • Is lighting adequate?

  • Is storage adequate and safe?

  • Can the work be accessed safely ie. roads, gangways, passageways, passenger hoists, staircases, ladders and scaffolds in good condition and free from obstruction?

  • Is the site safety signage adequate?

  • Are chemicals, flammable liquids kept safely and restricted to one days supply.? Bundled?

Ladders and Stepladders

  • Are ladders/stepladders all medium or heavy duty?

  • All ladders in good condition?

  • Are ladders secured at the top and/or well footed?

  • Are hand holds adequate at the top, 5 rungs above landing?

  • Are ladders positioned to prevent over stretching?

  • Are ladders placed at 75degrees ie base 1m away from the building for every 4m of rise?

  • Are any ladders resting on guttering?

  • Have inspection sheets been completed and in file?

  • Are stepladders used correctly?

Mobile Tower Scaffolding

  • Has the Tower been properly erected by competent persons?

  • Is bracing adequate?

  • Is height to base ratio adhered to (check manufacturers instructions)

  • Have ground/floor conditions been considered?

  • Are wheels locked when in use?

  • Are all materials and personnel off the tower when moved?

  • Is the working platform guarded and safe?

  • Is there an internal access ladder

  • Are inspection records being used and filed in site file?

  • Do operatives erecting or altering tower hold PASMA cards?

Mobile Elevating Work Platforms

  • Is the equipment being operated by a competent person?

  • Has the MEWP been inspected prior to use?

  • Has the inspection been recorded in the site file?

  • Can anyone be struck by the moving platform?

  • In case of a fall of materials from the platform, is the base fenced adequately?

  • Are the operators using the equipment safely?

  • Is the power supply isolated at the end of the working day?

  • Are harnesses being used?

  • Has the harness been inspected and recorded?

  • Are operatives clipping on with a Lanyard?

  • Has the Lanyard been inspected and recorded?

Personal Protective Equipment

  • If required are workers provided with PPE?

  • Is the PPE properly maintained?

  • Are operatives trained in the use of PPE?

  • If required, are visitors provided with PPE?

  • Is the PPE issue sheet being completed within the site file?

Operatives

  • Are any employee actions unsafe?

  • Are safety procedures being adhered to?

  • Are tools or equipment being misused?

  • Is manual handling kept to a minimum?

Plant and Machinery

  • Are all guards in place and in good repair?

  • Is machinery in good condition and operated properly?

  • Have operators received proper training and are manufacturers instructions being followed for the use of equipment?

Cartridge Operated Tools

  • Are the manufacturers instructions being followed?

  • Has the operator received training?

  • Is the operator aware of the dangers and be able to deal with misfires?

  • Are goggles/safety specs provided and worn?

  • Is the equipment clean and in good condition?

  • Are gun and cartridges kept in secure place when not in use to prevent third party/ unauthorised use?

  • Have inspections been carried and recorded in site safety file?

Fire and Emergencies / Hot Works

  • Is there an agreed name for the site and a means of raising the alarm and the emergency services in case of fire or other emergency?

  • Has the Principal Contractor co-ordinated his procedures with those of the site user?

  • Are the workers aware of the emergency procedures?

  • Are escape routes maintained?

  • Is the smoking ban maintained?

  • Is the correct fire fighting equipment in place?

  • Are permits to work in place?

  • If so, are copies of permits filed in site file?

Electricity

  • Is 110V power in use?

  • If mains power used are RCD's provided?

  • Are cables, connectors and plugs undamaged?

  • Is the equipment checked regularly and inspections recorded?

  • Are trailing leads safe?

  • Are power tools PAT tested and in date?

Control of Substances Hazardous to Health (COSHH)

  • Have all hazardous substances been identified and risk assessments been carried out?

  • Are those working with hazardous substances informed of the risks and the safe working procedure?

  • Are the manufactures data sheets available on site?

  • Are substances clearly marked and securely stored?

  • Are the safe working procedures being followed, including keeping non-essential personnel out of the danger area?

  • Has the Contract Administrator been informed that the hazardous substances are in use?

Corrective Actions

  • Enter any Corrective Action that are required here (include target dates for any action required):

Acknowledgements

  • Site Supervisor/Manager acknowledges receipt of inspection results and any corrective action that are required:

  • Inspection and Corrective action raised by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.