Title Page
-
Location Name
-
Customer
-
What service is Beaver Creek going to provide?
- Crude Production
- Crude Flowback
- Production Water
- Flowback Water
- Service Work
- Frac
- Construction
-
Prepared by
-
Conducted on
-
Location
General Information / Directions
-
Precise direction to be used in place of GPS if the need arises.
-
Client Name
-
Location Name
-
Service Provided (Initially)
- Crude Production
- Crude Flowback
- Production Water
- Flowback Water
- Service Work
- Frac
- Construction
-
Directions- Precise, Clear, and includes GPS anomalies.
Layout and Hazards
-
Sketch the site layout. Include traffic flow and initial plans for stages, i.e. from frat to flowback, if available. Include tank and Getty locations.
-
Please take clear photos of entrance and location. Multiple angles please. Specific hazards please.
-
Unusual hazards
-
Load, offload, or service directions.
-
Is the windsock correctly installed and in appropriate location?
-
Have all the deadman's been identified and clearly marked on the site map?
-
Has the flare site been examined and safe work and parking distances established?
-
Have the crossovers been examined and checked for proper location and strength?<br>
-
Please write your assessment in your own words and the current site condition.
-
Potential changes or services to be added later.
-
Add media
-
Company PIC or on-site contractors with phone numbers
-
Co. PIC / Phone
-
Co. PIC /Phone
-
Co. PIC or Contractor / Phone
-
Co. PIC or Contractor / Phone
Sign Off
-
Add signature
-
Add signature