Title Page
-
Site
-
Client
-
Prepared by
-
Confirm address
-
Sign in / out sheet up to date?
-
FFL Visibly marked on site?
-
Notes
-
Foundation Solution(s)
-
Foundation Notes
-
Works completed on site
- Site Established
- Excavation / Backfill
- Formwork
- Pods / Reo placement
- Concrete Pour
-
All completed tasks to NZ Standard?
-
Works Complete Notes
-
Works happening on site during visit
- Site Established
- Excavation / Backfill
- Formwork
- Pods / Reo placement
- Concrete Pour
-
Excavation completed to NZ Standard
-
Formwork in correct position?
-
Formwork Plumbed?
-
Formwork for rebates
-
Formwork braced?
-
Finished concrete level displayed on Formwork?
-
HD Bolts, cast ins and plates all checked?
-
Has BLC been ordered?
-
Reo; Control joints / re-entrant bars
-
Reo; Cover to boxing?
-
Reo; Laps
-
Add site photos
-
Any Variations to record
-
Variation description
-
Has BCP QS been notified?
-
Has client been notified?
-
Any programme implications?
-
Overall, is the project to schedule?
-
Any unresolved issues on site to be recorded?
-
Signature Required