Title Page

  • Client / Site

  • Location
  • Conducted on

  • Prepared by

Internal

INTERNAL

Shelving.

  • Shelving make?

  • Ex. Wall upright height?

  • Proposed wall upright height

  • Ex. Gondola height?

  • Proposed gondola height?

  • Height.

  • Additional notes

Bartuf

  • Magazines

  • Cards

  • Notes

Counter.

  • Number of tills

  • Lottery.

  • Safe?

  • Retain

  • Panic alarm?

  • Pump controls?

  • Retain

  • Relocate?

  • Additional notes

Ceiling

  • Structural Ceiling height

  • False ceiling height

  • Low beams?

  • Heights?

  • Additional notes

Floor

  • Existing finish

  • Photo of floor finish.

  • Sub floor

  • Flooring action?

  • Additional notes

Electrics

  • Phase

  • KVA

  • Size of board (number of ways)

  • Location

  • Photo of board

  • Location of incoming supply

  • Photo of incoming supply

Refrigeration & air conditioning

  • Are there existing condensing units?

  • Take photo of condensing unit and mark on plan.

  • Is there air conditioning?

  • Take photo(s) and mark locations on plan.

External

EXTERNAL

Entrance door

  • Photo of entrance door

  • Door height (clear entrance)

  • Door width (clear entrance)

  • Is the header removable?

  • Additional notes

Access

  • Are there any obstructions? Steps, ramps, bollards etc.

  • Steps

  • Take photo of steps

  • Measure and mark up on plan.

  • Ramp

  • Take photo of ramp

  • Measure and mark up on plan.

  • Railing/wall/bollards

  • Take photo

  • Removable?

  • Measure and mark up on plan.

  • Additional notes

PRE CONSTRUCTION INFO

  • Was the building constructed before 2000?

  • Asbestos is not present in buildings constructed after 2000. Move on to next question.

  • Does the retailer have an asbestos report.

  • A report will be required before works start on site.
    If the retailer wishes to arrange their own report they need a REFURBISHMENT SURVEY and ideally we should supply the surveyor with a plan and scope of works.
    If the retailer wishes for us to arrange a survey the cost is £500

  • Please ask for a copy to be reviewed.

  • Store trading?

  • How will the work be completed safely?

  • Notes

  • Projected number of closure days

  • Notes

  • Is there a basement?

  • Site may require structural survey if additional equipment is being installed.

  • Notes

  • Is there any requirement for unusual work at height I.e. Working above a normal ceiling height, on roofs or manoeuvring/fitting large equipment at height?

  • Notes

  • Are existing welfare facilities available (toilet, drinking water,tea making facilities)

  • Arrangements will need making for welfare facilities.

  • Notes

  • Are there any parking restrictions?

  • Notes

  • Add media

  • Is there a parking space for a delivery wagon in front of the store?

  • Notes

  • Is there a place for a skip?

  • Proposed location.

  • Stop and collect rubbish removal may be required.

Project Planning

PROJECT PLANNING

  • Proposed Project Start

SCOPE OF WORKS

  • Shelving.

  • Additional notes

  • Add media

  • Woodwork

  • Service counter

  • Notes

  • Add media

  • FTG Counter

  • Notes

  • Add media

  • Cladding

  • Notes

  • Add media

  • End panels

  • Colour

  • Notes

  • Add media

  • Refrigeration

  • Notes

  • Add media

  • Air con

  • Notes

  • Add media

  • Food To Go

  • Subway

  • Costa

  • New food to go

  • Reconfigure Food To Go

  • Greggs

  • Notes

  • Add media

  • Lights

  • Notes

  • Add media

  • Electrics

  • Sockets for new equipment

  • Reposition sockets

  • New fuse box

  • Notes

  • Add media

  • Ceiling works

  • New false ceiling

  • Additional false ceiling

  • Re-tile false ceiling

  • New ceiling rafts

  • Notes

  • Add media

  • Building works

  • New stud walls

  • Alter existing stud walls

  • Alter block work

  • Notes

  • Add media

  • Perimeter frieze

  • Notes

  • Add media

  • Shopfront

  • Notes

  • Add media

  • Flooring

  • New ceramic

  • New vinyl

  • New loose lay

  • Repair existing

  • Notes

  • Add media

  • Internal signage

  • Phrases

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.