Title Page
-
Client / Site
-
Location
-
Conducted on
-
Prepared by
Internal
INTERNAL
Shelving.
-
Shelving make?
-
Ex. Wall upright height?
-
Proposed wall upright height
-
Ex. Gondola height?
-
Proposed gondola height?
- 1480mm
- 1720mm
- 1800mm
- Other
-
Height.
-
Additional notes
Bartuf
-
Magazines
-
Cards
-
Notes
Counter.
-
Lottery.
-
Safe?
-
Retain
-
Panic alarm?
-
Pump controls?
-
Retain
-
Relocate?
-
Additional notes
Ceiling
-
Structural Ceiling height
-
False ceiling height
-
Low beams?
-
Heights?
-
Additional notes
Floor
-
Existing finish
- Ceramic
- Vinyl
- Other
-
Photo of floor finish.
-
Sub floor
-
Flooring action?
- New ceramic floor
- New vinyl floor
- New loose lay floor
- Repair floor
- Existing floor to remain
-
Additional notes
Electrics
-
Phase
-
KVA
-
Location
-
Photo of board
-
Location of incoming supply
-
Photo of incoming supply
Refrigeration & air conditioning
-
Are there existing condensing units?
-
Take photo of condensing unit and mark on plan.
-
Is there air conditioning?
-
Take photo(s) and mark locations on plan.
External
EXTERNAL
Entrance door
-
Photo of entrance door
-
Door height (clear entrance)
-
Door width (clear entrance)
-
Is the header removable?
-
Additional notes
Access
-
Are there any obstructions? Steps, ramps, bollards etc.
-
Steps
-
Take photo of steps
-
Measure and mark up on plan.
-
Ramp
-
Take photo of ramp
-
Measure and mark up on plan.
-
Railing/wall/bollards
-
Take photo
-
Removable?
-
Measure and mark up on plan.
-
Additional notes
PRE CONSTRUCTION INFO
-
Was the building constructed before 2000?
-
Asbestos is not present in buildings constructed after 2000. Move on to next question.
-
Does the retailer have an asbestos report.
-
A report will be required before works start on site.
If the retailer wishes to arrange their own report they need a REFURBISHMENT SURVEY and ideally we should supply the surveyor with a plan and scope of works.
If the retailer wishes for us to arrange a survey the cost is £500 -
Please ask for a copy to be reviewed.
-
Store trading?
-
How will the work be completed safely?
-
Notes
-
Notes
-
Is there a basement?
-
Site may require structural survey if additional equipment is being installed.
-
Notes
-
Is there any requirement for unusual work at height I.e. Working above a normal ceiling height, on roofs or manoeuvring/fitting large equipment at height?
-
Notes
-
Are existing welfare facilities available (toilet, drinking water,tea making facilities)
-
Arrangements will need making for welfare facilities.
-
Notes
-
Are there any parking restrictions?
-
Notes
-
Add media
-
Is there a parking space for a delivery wagon in front of the store?
-
Notes
-
Is there a place for a skip?
-
Proposed location.
-
Stop and collect rubbish removal may be required.
Project Planning
PROJECT PLANNING
-
Proposed Project Start
SCOPE OF WORKS
-
Shelving.
-
-
Additional notes
-
Add media
-
Woodwork
-
Service counter
-
Notes
-
Add media
-
FTG Counter
-
Notes
-
Add media
-
Cladding
-
-
Notes
-
Add media
-
End panels
-
Colour
-
Notes
-
Add media
-
Refrigeration
-
-
Notes
-
Add media
-
Air con
-
Notes
-
Add media
-
Food To Go
-
Subway
-
Costa
-
New food to go
-
Reconfigure Food To Go
-
Greggs
-
Notes
-
Add media
-
Lights
-
Notes
-
Add media
-
Electrics
-
Sockets for new equipment
-
Reposition sockets
-
New fuse box
-
Notes
-
Add media
-
Ceiling works
-
New false ceiling
-
Additional false ceiling
-
Re-tile false ceiling
-
New ceiling rafts
-
Notes
-
Add media
-
Building works
-
New stud walls
-
Alter existing stud walls
-
Alter block work
-
Notes
-
Add media
-
Perimeter frieze
-
Notes
-
Add media
-
Shopfront
-
Notes
-
Add media
-
Flooring
-
New ceramic
-
New vinyl
-
New loose lay
-
Repair existing
-
Notes
-
Add media
-
Internal signage
-
Phrases