Title Page

  • Site Name

  • Conducted on

  • Completed by

  • Location

Site Information

Manager Information

  • Managers Name?

  • Managers Mobile Number?

  • Area Manager Name?

Site Access

  • Monday Opening Time?

  • Monday Closing Time?

  • Tuesday Opening Time?

  • Tuesday Closing Time?

  • Wednesday Opening Time?

  • Wednesday Closing Time?

  • Thursday Opening Time?

  • Thursday Closing Time?

  • Friday Opening Time?

  • Friday Closing Time?

Site Information

  • Office Location?

  • EPoS DB Location?

  • Photo of EPoS DB

  • Detail the location of where the DB has been installed

Front of House Information

    Tills and Peripherals
  • Location of till?

  • What type of Cash Drawer do they have installed?

  • Photo of Till and Cash Drawer

  • Does this till have an RP?

  • Photo of RP's

  • Is there sufficient power for an additional RP?

  • Single 3PIN socket will need to be installed

  • Number of PEDs?

  • Is there sufficient power at the till position for an additional PED?

  • Single 3PIN socket will need to be installed

  • Detail where the available socket is located

  • Photo of PEDs

  • Does this till location have enough space to accommodate an additional PED?

  • Where is a suitable location for this PED?

  • Photo of new PED location

  • Detail where the available space is for the PED

  • How many data points does this till have available?

  • Each server station will have 1 x VX820 PED

  • VX820
  • Which till is closest to this server station?

  • Can the front bar accommodate power and data points for this tills PED?

  • Photo of where it can be installed

  • Can you detail the cable route to the front bar?

  • Will it need a waterproof box for the power and data point?

  • Detailed explanation as to why?

  • Photo of under counter

  • Can the front bar accommodate an IP box being installed?

  • Detailed explanation as to why?

  • Photo of where it can be installed

  • Photo of IP box location

  • Does an access hole need to be drilled into the bar for the PED cables?

  • Detailed explanation as to why

  • If single server station, PED pole to be fitted in front of glass section

  • If double server station, PED pole to be positioned on the side of the glass section

  • Photo of PED pole location clearly marked up

  • Bar Type?

  • Total RP Count

Other Till Locations

  • Do they have a door till?

  • Photo of till in location

  • When the till is not in use, is it in a secure location?

  • What makes it secure?

  • Do they have a cloak room till?

  • Photo of till in location

  • When the till is not in use, is it in a secure location?

  • What makes it secure?

Office Information

  • Does site have a Comms Cab?

  • What size Comms Cab has been installed?

  • How many ports are available on the patch panel?

  • Photo of Comms cab (With and without the cab door open)

  • Can the cab accommodate a new PED switch?

  • Can a bigger Comms Cab be installed in place of the existing cab?

  • What size cab is required?

  • Photo of new Comms Cab location

  • Will this result in a recable?

  • Detailed explanation as to why?

  • List of data points inside the existing Comms Cab?

  • What size cab will be required?

  • Can it accommodate a new patch panel if this is required alongside the new switch?

  • Can a bigger Comms Cab be installed in place of the existing cab?

  • What size cab is required?

  • Photo of new Comms Cab location

  • Will this result in a recable?

  • Detailed explanation as to why?

  • List of data points inside the existing Comms Cab?

  • What size cab will be required?

  • Is there sufficient power in the cab for the additional PED switch?

  • ***New 7-Way PDU will be required***

  • What size cab is required?

  • Photo of new Comms Cab location

  • Will this result in a recable?

  • Detailed explanation as to why?

  • List of data points inside the existing Comms Cab?

Office Till location

  • Do they have space to accommodate a till being left in the office?

Hardware Requirements

  • How many server stations do they have?

VX680 Kit

  • How many VX680's are required?

  • How many cradles are required?

  • How many PSU's are required?

VX820 Kit

  • How many VX820's are required?

  • How many PED Poles are required?

  • How many PED Packs are required?

  • How many IP Boxes are required?

  • How many Pink Patch Leads are required? (0.5 and 1m)

  • How many Ped Switches are required?

  • How many PED Dongles are required?

  • How many 7way PDU's are required?

Office Spares

  • 2 x VX680sPEDs if 1-6 tills. 3 x VX680s PEDs if 7-10 tills. 4 x VX680s 10+ tills

  • How Many VX680's are required?

  • How Many Cradles are required?

  • How Many PSU's are required?

  • How Many PED Batteries are required?

  • How Many Tills are required?

Sign Off

  • Would you be on board with having the fixed VX820 installed on the bar?

  • Reasons why?

  • Manager Signature

  • Manager Name

  • Engineer Signature

  • Engineer Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.