Title Page
Details
-
Conducted on
-
Prepared by
-
Who?
-
Client and Tenure
-
Who?
-
Survey Type
-
First Line of Address
-
Front Elevation Photo
-
GPS
Dynamic Risk Assessment
Access Assessment
-
Do you give consent for us to carry out works within your property ?
-
Reasoning?
-
Is there an overhead main power cable to the property that needs sheathing before scaffold erected?
-
Photographic Evidence
-
Are there any conservatories or out buildings that require a scaffold bridge for this job?
-
Are there any restrictions to the property i.e. Low bridge, neighbours access required ?
-
Comments
-
Photographic evidence
-
Is the property location a main pedestrian route and/or a public walkway ?
-
Comments
-
Photographic evidence
-
Is parking available, adequate for the size of vehicle and close to the property ?
-
Comments,
-
Photographic evidence
-
Do parking restrictions exist i.e. Residents parking ?
-
Comments
-
Photographic evidence
-
Will the proposed works affect neighbouring properties ?
-
Comments
-
Photographic evidence
-
Has the neighbouring property been notified of the imminent works?
-
Date of notification given-
Occupant Assessment
-
Is the property in a suitable condition for the proposed works to be carried out ?
-
Comments
-
Photographic evidence
-
Is the property highlighted as flagged or at risk ?
-
Comments
-
Do the occupants have any physical disabilities that pose any significant risks ?
-
Comments
-
Do the occupants have any learning difficulties where our activities may pose any significant risks ?
-
Comments
-
Are there any potential risks regarding minors in the property ?
-
Comments
-
Are there any potential risks regarding pets in the property ?
-
Comments
-
Is the property high risk of biological waste or vermin ?
-
Comments
-
Photographic evidence
-
Is the property at high risk of hypodermic needles ?
-
Comments
Asbestos Assessment
-
Are we in receipt of or have access to the asbestos survey or register for this property ?
-
Asbestos Assessment Needs to be Checked
-
Comments
-
Has asbestos been identified ?
-
Comments
-
Photographic evidence
Resident Details
Resident Details
-
Resident Name
-
Resident Contact Number
-
Resident Email
-
Best Days for Installation / Days to Avoid
-
Current Energy Supplier
- Utilita
- British Gas
- EON
- EDF
- Octopus
- OVO
- nPower
- Scottish Power
- Boost
- Other
- Unknown
-
Which Supplier?
-
Is the MPAN Number Present
-
What is the MPAN Number
-
What price per kWh does the resident pay?
PV Survey
PV Survey
Roof Type
-
Roof Style
- Gable Roof
- Hipped Roof
- Gambrel Roof (barn style)
- Flat Roof
- Mansard Roof
- Shed Roof
-
Tile Type
- Plain tiles / Slates (solar limpets)
- Low profile Interlocking tiles / Redland Tiles (220 wide)
- Profiled Tiles (Standard)
- Flat Roof
-
Tile Description (clay or concrete, interlocking or lapped)
- Clay
- Concrete
- Slate
- Interlocking
- Lapped
- Unknown
Roofing and Scaffold
-
Scaffold Location
- Front
- Back
- Left Side
- Right Side
-
Height of Eaves? (Metres)
-
Required Access to rear?
-
Location of rear access
-
Where?
-
Length along the gutter (Metres)
-
Height up the roof slope (Metres)
-
Pitch ° degrees
-
Height of Roof Above Eaves? (Metres)
-
Front of Property Orientation in ° Degrees
-
Is the Loft Accessible?
-
Roof type
-
Size of Purlin (mm)
-
Number of Purlin Supports Front
- 0
- 1
- 2
- 3
- 4
- 5
- 6
-
Number of Purlin Supports Back
- 0
- 1
- 2
- 3
- 4
- 5
- 6
-
Number of Purlin Supports Side
- 0
- 1
- 2
- 3
- 4
- 5
- 6
-
Maximum Unsupported Rafter Length (Metres)
-
Size of Rafters/Top Chord of Truss (mm)
-
Number of Trusses/Rafters
-
Rafter/Truss Centres (mm)
-
Timber Condtion
-
Felt Condition
-
Observations (e.g holes in felt around gas flue)
-
Loft Condition
- Clear
- Cluttered
- Tenant Agreed to clear loft
- Area Around Hatch Blocking Access
-
Is There a Smoke Detector in the Loft
-
New Smoke Detector to be Fitted in Loft
-
What is the Make and Model
-
Does it Need Replacing With Client Specified Model
-
Any Issues With Loft access
-
What Issues?
-
Loft Headroom Meters
- 0.80 metres
- 0.90 metres
- 1.00 metres
- 1.20 metres
- 1.40 metres
- 1.50 metres
- 1.60 metres
- 1.80 metres and above.
-
Temporary Loft Light Required
-
Temporary Loft Walkway Required
-
Why?
- No Hatch
- Hatch Blocked
- Hatch Over Stairs (Cannot Access Safely)
- Resident Refused Access
- Other
-
Notes
Electrics
-
Consumer Unit Make and Model
- Crabtree Starbreaker
- Hager
- MK
- Lewden
- Wylex
- Schneider
- Other
- Unable to Access
-
What Brand?
-
Breaker Type
-
Consumer Unit Visually Compliant?
-
Location
- Under Stairs
- Front Hallway
- Cupboard
- External
- Other
- Under Sink
- Unknown
-
Where?
-
Distribution Board Upgrade Required
-
Spare Way for PV
-
Additional Garage DB Required for PV
-
Earthing to Gas Meter
-
Gas Meter Location
- Under Stairs
- Front Hallway
- Cupboard
- External
- Other
- Under Sink
- Unknown
-
Where?
-
Earthing to Water Main
-
Water Main Location
- Under Stairs
- Front Hallway
- Cupboard
- External
- Other
- Under Sink
- Unknown
-
Where?
-
Earthing Type
Import Meter Type
-
Meter Type
-
Does Meter require changing?
-
Make and Model of Meter
-
What Model?
-
Meter Serial Number
-
Is there room for the 4 pole isolation switch next to the existing meter
-
Import Meter Location
-
Where is it?
-
Generation Meter Location (Proposed)
-
Where shoud it be located?
Photovoltaic System Proposed
-
Proposed Inverter Location
-
Where should is be located?
-
Can a 600 x 780 board fit on wall and through internal roof access
-
Approx AC cable run length from Consumer Unit to Inverter
-
Cellular Networks Checked with Good Signal?
- O2
- Vodaphone
- BT EE
- 3
- Other
-
Is a PV Diverter Required? (Eddi)
-
Will there be Battery Storage
-
Size of Proposed Area
-
Distance to DB
-
Proposed Battery Location
-
Photo of Proposed Location
-
Is Bird Mesh Required?
Photo Checklist
-
Property Elevations, Front Door & Scaffold Access
-
Suitable Roof Elevation Close Up including gutter
-
Proposed Inverter Location
-
Roof Void if relevant including TV ariel
-
Consumer Unit and Close up of Breakers
-
Electricity Meter & Mains Fuse / Earth in Meter Box
-
Water Main Bond
-
Gas Main Bond (if applicable)
-
Satellite Dish (if any) including closeup of bracket
Shading
-
Has SunEye Survey been completed
-
Why?
-
Notes
-
Notes
Sign Off
Assessment Sign off
-
Surveyors Signature and Full name