Information
-
Site conducted
-
Facility name :
-
Address
-
SUBURB
-
Report prepared by:
LEGACY and BACKGROUND INFORMATION
-
Date and time of audit
-
Weather at time of audit
- Raining
- Wet but not raining
- Dry
-
Authority ID number
-
FAR ID number
-
GIS REF (OR USE GPS IF CONNECTED TO NETWORK)
-
PHOTO (S) OF FACILITY
-
Is this facility known to contain asbestos or does it have asbestos stickers ?
-
Are stickers clearly visible and adequate for the facility ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY (Usually HIGH)
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
IS THE FACILITY LEASED ?
-
IS THE FACILITY NORMALLY LOCKED DURING THE DAY ?
-
KEY HOLDER ; NAME, ADDRESS AND TELEPHONE NUMBER
-
Date placed in service if known
-
Approx gross floor area of structure m2
-
LEGACY INFORMATION / COMMENTS
ROOF & DRAINAGE
-
Roof area m2
- Covering
-
ROOF COVERING (Material)
- ZINC ALUM
- COLOURBOND
- CONCRETE TILES
- CLAY TILES
- REINFORCED CONCRETE
- POLYCARBONATE
- STAINLESS STEEL
- PVC
- UNKNOWN
- OTHER
- COMP FIBRE WITH COVERING
- CHAINS
-
PROVIDE DETAILS OF MATERIAL
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Gutters
-
ARE THERE GUTTERS ?
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Downpipes
-
ARE THERE DOWNPIPES ?
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Eaves / soffits / Fascias
-
Is there a defect with eaves/soffits/fascias ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
-
General comments roof and drainage
External Elements
-
Is there an outside tap ?
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
TAKE PHOTO OR ADD FROM LIBRARY
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
Cost to rectify
-
Is there an outside light ?
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQUIRED:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to repair
-
Are there any trees or vegetation that are interfering with the facility or blocking gutters etc.?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
TAKE PHOTO OR ADD FROM LIBRARY
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
Cost to rectify
FINISHES - EXTERNAL
- Wall
-
EXTERNAL Wall Finishes (Material) e.g. painted render
- BLOCKS/BRICKS - UNPAINTED
- BLOCKS/BRICKS - PAINTED
- BLOCKS - RENDERED - UNPAINTED
- BLOCKS - RENDERED - PAINTED
- TIMBER CLAD - UNPAINTED
- TIMBER CLAD - PAINTED
- METAL COVERED
- COMPOSITE
- FIBRO
- UNKNOWN
- OTHER
-
PROVIDE DETAILS OF MATERIAL
-
IS THERE A DEFECT WITH EXTERNAL WALL FINISHES .?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Windows / Louvres
-
IS THERE A DEFECT WITH WINDOWS OR LOUVRES ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Security screens etc.
-
IS THERE A DEFECT WITH SECURITY WINDOW: SCREENS, SHUTTERS OR BARS ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- External doors
-
IS THERE A DEFECT WITH EXTERNAL DOORS ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
-
EXTERNAL FINISHES - GENERAL COMMENTS
STRUCTURAL COMPONENTS
- Roof
-
ROOF STRUCTURE (Material) - (NOT roof covering - e.g. timber trusses)
- TIMBER TRUSSES
- CONCRETE BEAMS
- COMPOSITE
- METAL
- MASONARY
- OTHER
- UNKNOWN
-
PROVIDE DETAILS OF MATERIAL ..
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQUIRED:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to repair
- Walls
-
WALLS / FRAME (Material) - (NOT FINISHES - e.g. Steel Frame)
- CLAY BRICK
- TIMBER
- COMPOSITE
- POLYCARBONATE
- OTHER
- UNKNOWN
- CONCRETE BLOCK
- METAL
- CONCRETE PANEL
-
PROVIDE DETAILS OF MATERIAL ..
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Floor
-
FLOOR (Material) - (NOT COVERINGS e.g. reinforced concrete)
- REINFORCED CONCRETE
- TIMBER - SOLID
- PLY BOARD
- COMPRESSED FIBRES
- STONE
- NATURAL SURFACE
- BRICK
- UNKNOWN
- OTHER
-
PROVIDE DETAILS OF MATERIAL ..
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Footings
-
IS IT POSSIBLE TO SEE THE FOOTINGS / STUMPS THAT FORM PART OF THE FOUNDATION ?
-
FOUNDATION (Material) - (NOT COVERINGS e.g. timber stumps)
- foundation
- CONC SLAB ON GROUND
- CONCRETE PILES/FOOTINGS
- WOODEN PILES/SUPPORTS
- OTHER
- UNKNOWN
-
PROVIDE DETAILS OF MATERIAL
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
-
ARE THERE ANY STRUCTURALLY SIGNIFICANT CRACKS, DEFORMATIONS IN THE FLOOR THAT WOULD INDICATE A FAILURE IN THE FLOOR / FOUNDATIONS ?
-
PROVIDE DETAILS OF THE DEFECT TO ASSIST IN FOLLOW UP INSPECTION ...
-
STRUCTURAL COMPONENTS - GENERAL COMMENTS
FINISHES INTERNAL
- Internal walls
-
INTERNAL Wall Finishes (Material) e.g. painted blockwork
- PAINTED BLOCK/BRICK
- NATURAL TIMBER
- STONE
- COMPOSITE
- EXPOSED BRICK / BLOCK
- GLASS
- OTHER
- UNKNOWN
- PAINTED FIBRO SHEETS
- ASBESTOS SHEETS UNPAINTED
- ASBESTOS SHEETS PAINTED
- GYPROCK PAINTED
- GYPROCK UNPAINTED
-
PROVIDE DETAILS OF MATERIAL
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Internal ceiling
-
CEILING FINISH (Material) e.g. painted boards
- underside of roof covering
- PAINTED BOARD/GYPROCK
- NATURAL TIMBER
- SHEET METAL
- UNPAINTED BOARDS
- VJ BOARDS - PAINTED
- ACOUSTIC TILES
- PAINTED CONCRETE
- UNPAINTED CONCRETE
- UNKNOWN
- OTHER
-
PROVIDE DETAILS OF MATERIAL ..
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Internal floor covering
-
FLOOR COVERING (Material) e.g. Tiled
- FINISHED CONCRETE
- TILED
- CARPET
- LINO
- FLOATING TIMBER
- RUBBER
- PAINTED CONCRETE
- STONES
- NONE - NATURAL
- UNKNOWN
- OTHER
-
PROVIDE DETAILS OF MATERIAL ..
-
IS THERE A DEFECT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Internal doors
-
IS THERE A DEFECT with INTERNAL DOORS ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
-
INTERNAL FINISHES - GENERAL COMMENTS
SERVICES
- Water
-
IS THERE HOT WATER AVAILABLE ?
-
PROVIDE DETAILS OF HEATING SOURCE ... And LOCATION
-
WHAT IS THE GENERAL CONDITION OF THE HEATER ?
- VERY GOOD (20+yrs)
- GOOD (10 - 20yrs)
- AVERAGE (5 - 10 yrs)
- POOR (3-5 yrs)
- VERY POOR (<3 years)
- FAILED / DORMANT
- not applicable
-
IS THERE A DEFECT IN THE HOT WATER SYSTEM ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Sewerage
-
Is the facility connected to main sewerage reticulation?
- Electricity
-
No. Of internal lighting units
-
No. Of power points
-
No. Of electrical extract fans
-
ARE ALL CIRCUITS PROTECTED BY RCDS ETC.?
-
HAS THE RCD BEEN TESTED WITHIN THE LAST 12 MONTHS ?
-
REPORT AS HIGH PRIORITY WORKS:
- HIGH PRIORITY DEFECT
-
REPORT AS HIGH PRIORITY WORKS:
- HIGH PRIORITY DEFECT
-
Cost to rectify
-
IS THERE A DEFECT WITH ANY ELECTRICAL SUPPLY OR EQUIPMENT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO OR ADD FROM LIBRARY
-
Cost to rectify
-
General comments on services
TOILET FACILITIES
- Toilet type
-
Are there any cisterns that are single flush and not associated with a trough or urinal?
-
IS THERE A DEFECT WITH ANY CISTERNS, PANS, URINALS OR TROUGHS ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO OR ADD FROM LIBRARY
-
Cost to rectify
- Basins and Sinks
-
IS THE CLEANERS TAP SHIELDED ?
-
If "no" raise a defect
-
IS THERE A DEFECT WITH SINKS OR BASINS ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO
-
Cost to rectify
- Showers
-
Are there showers present?
-
IS HOT WATER AVAILABLE FOR SHOWERS ?
Ancillary Equipment
-
LIST ANCILLARY EQUIPMENT AND NUMBER OF EACH (e.g. NEEDLE BINS X 6)
ANCILLARY
-
ANCILLARY DESCRIPTION
-
IS THERE A DEFECT WITH THIS PIECE OF ANCILLARY EQUIPMENT ?
-
ENTER DEFECT DETAILS AND WORKS REQ:
-
ENTER WORKS PRIORITY:
- VERY HIGH - within 1 week
- HIGH - within 1 month
- MEDIUM - 3 - 6 months
- LOW - within 1 yr
- PROG - 1 - 2 yrs
- PROG - 3 - 5 yrs
-
TAKE PHOTO OR ADD FROM LIBRARY
-
Cost to rectify
FACILITY SUMMARY AND CONDITION RATING
-
CR of ROOF COVERING, GUTTERS, DOWNPIPES and FASCIAS (RUL in Brackets)
- VERY GOOD (20+yrs)
- GOOD (10 - 20yrs)
- AVERAGE (5 - 10 yrs)
- POOR (3-5 yrs)
- VERY POOR (<3 years)
- FAILED / DORMANT
- not applicable
-
CR of BUILDING STRUCTURE AS A WHOLE (RUL in Brackets)
- VERY GOOD (20+yrs)
- GOOD (10 - 20yrs)
- AVERAGE (5 - 10 yrs)
- POOR (3-5 yrs)
- VERY POOR (<3 years)
- FAILED / DORMANT
- not applicable
-
CR of EXTERNAL FINISHES (RUL in Brackets)
- VERY GOOD (20+yrs)
- GOOD (10 - 20yrs)
- AVERAGE (5 - 10 yrs)
- POOR (3-5 yrs)
- VERY POOR (<3 years)
- FAILED / DORMANT
- not applicable
-
CR of INTERNAL FINISHES (RUL in Brackets)
- VERY GOOD (20+yrs)
- GOOD (10 - 20yrs)
- AVERAGE (5 - 10 yrs)
- POOR (3-5 yrs)
- VERY POOR (<3 years)
- FAILED / DORMANT
- not applicable
-
CR of TAP, BASIN & SANITARY WARE (RUL in Brackets)
- VERY GOOD (20+yrs)
- GOOD (10 - 20yrs)
- AVERAGE (5 - 10 yrs)
- POOR (3-5 yrs)
- VERY POOR (<3 years)
- FAILED / DORMANT
- not applicable
-
CR of ELECTRICAL SERVICES (RUL in Brackets)
- VERY GOOD (20+yrs)
- GOOD (10 - 20yrs)
- AVERAGE (5 - 10 yrs)
- POOR (3-5 yrs)
- VERY POOR (<3 years)
- FAILED / DORMANT
- not applicable
-
General comments about whole facility
-
Actual condition score obtained
-
Condition range . RUL. SCORE
1 - Very Good. 20+ years. . >60
2 - Good. 10-20 years. 55-60
3 - Average. 5-10 years. 31-54
4 - Poor. 3-5 years. 18-30
5 - Very Poor. . <3 years. <18 -
What is the actual Condition based on the total score ?
-
Is the facility adequate for its intended use ?
-
If it doesn't meet LoS requirement, provide details. Or use this space to provide general comments