Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Quote Details
-
Enter Details of original quote, what was required, originator, project and scope
Initial Survey
-
How many cable outlets and patch panels were installed
-
Are all cable runs tested and a report generated?
- YES
- NO
- UNCLEAR
-
How many switches and switch ports were installed?
-
Take Photos of all new installed items
Survey completed by: (sign below)
-
Signed by
-
Date completed