Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Quote Details
-
Enter Details of quote, what is required, originator, project and scope
Initial Survey
-
How many cable outlets and network ports are required?
-
Are enough patch ports available?
- YES
- NO
- UNCLEAR
-
Are enough switch ports available?
- YES
- NO
- UNCLEAR
-
take photo(s) of Patch Panels
-
take photo(s) of Network Switches
Survey completed by: (sign below)
-
Signed by
-
Date completed